Investment Case Details
Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
A$54,512.00
A$250,000.00
Package Summary (Open-Pit Mine Development & Ore Handling Systems)
The Pilbara Rare Earths Extraction & Processing Facility is designed to secure Australia’s position as a critical supplier of rare earth minerals essential for electric vehicles, wind turbines, advanced electronics, and defence applications. Located in a high-grade deposit zone in the Pilbara region, this project taps into some of the world’s richest reserves of neodymium, praseodymium, and dysprosium — minerals vital for high-performance magnets and clean energy technology.
About Package 1
Scope of work includes:- Mine Site Clearing & Overburden Removal – Preparing the site for active mining.
- Drilling & Blasting Operations – Controlled fragmentation of ore-bearing rock.
- Primary Haul Roads – Construction of heavy-duty haulage routes for ore trucks.
- Ore Loading & Crushing Stations – Facilities to break down ore for transport.
- Dust Suppression & Environmental Controls – Compliance with strict environmental standards.
- Heavy Equipment Procurement – Excavators, haul trucks, and support vehicles.
- Weighbridge & Security Systems – Infrastructure for load monitoring and site security.
Investment Details
- Investment Range: $400 – $20,000
- Daily ROI: ~0.60%
- Term: 300–400 days
- Annualised ROI: ~144%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual

Why Package 1 is Strategic
- Critical First Step – Mining can’t begin without site preparation and haul infrastructure.
- Long-Term Asset Value – Developed mines generate decades of returns.
- Export Demand – Rare earth demand is surging for renewable energy and high-tech manufacturing.
- Government Priority – Rare earths are classified as critical minerals in Australia’s strategic supply list.
Comments
Review
With Package 1 completed, initial ore output can start within months.
Yes — haul trucks and drills will integrate autonomous operation for efficiency and safety.
Economically viable deposits like those in the Pilbara are rare — and in high global demand.
Package 1 includes dust suppression systems, runoff controls, and land rehabilitation plans from day one.
Primary buyers include manufacturers in Japan, South Korea, the EU, and the US — all seeking to diversify supply away from China.
Mining timelines can be impacted by weather and logistics, but the Pilbara has established mining infrastructure and reliable access.
On-site security fencing, surveillance, and controlled entry points are built into Package 1 to protect equipment and ore stockpiles.
Yes, site tours can be arranged for verified investors during non-operational periods for safety reasons.
Absolutely — the project will prioritise hiring from local communities, with FIFO (fly-in fly-out) operations for specialist roles.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Mining & Resources (Package 1: Open-Pit Mine Development & Ore Handling Systems – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.60%
- Accrual days ~ 350
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-08-11
- Raised AmountA$54,512.00
- Goal AmountA$250,000.00
Recent Cases
A$48,847.00
0.50%
A$53,182.00
0.65%
A$83,148.00
0.95%
A$48,021.00
0.52%