Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Mining & Resources (Package 3 - Pilbara Rare Earths Extraction & Processing Facility)
RAISED
$142,874.00
GOAL
$1,000,000.00
Project Overview (Export Logistics Hub & Port Integration)
With the mine operational (Package 1) and the processing plant producing high-purity rare earth oxides (Package 2), Package 3 delivers the export infrastructure required to move the final product to global markets. This package establishes a dedicated logistics hub, containerised product storage, and integrated port facilities to handle the secure, efficient transport of rare earth minerals to buyers in Asia, Europe, and North America.
About Package 3
Scope of work includes:- Containerised Storage Facilities – Climate-controlled warehouses for packaged rare earth oxides.
- On-Site Rail Loading Terminal – Bulk and container loading systems connected to existing freight lines.
- Heavy-Duty Trucking Depot – Fleet management, maintenance bays, and driver facilities.
- Port Integration Infrastructure – Expansion of berth space, cranes, and handling equipment at the designated export port.
- Security & Tracking Systems – RFID tagging, surveillance, and customs compliance systems.
- Customs Clearance Offices – On-site facilities for inspections and export documentation.
- Emergency Response Systems – Fire suppression, spill containment, and hazardous material protocols.
Investment Details
- Investment Range: $150,000 – $500,000
- Daily ROI: ~0.95%
- Term: 300–400 days
- Annualised ROI: ~236%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual

Why Package 3 is Strategic
- Market Access Enabler – Without export infrastructure, sales to global buyers can’t occur.
- Premium Market Reach – Direct access to Asia-Pacific and European high-tech manufacturing hubs.
- Operational Efficiency – Reduces turnaround times from processing to shipment.
- Security of Supply – Controlled, trackable logistics meet international security and compliance standards.
- Scalable Export Capacity – Designed for current needs with ability to double throughput as demand grows.
Comments
Review
The project will integrate with a deep-water port in Western Australia, optimised for bulk and containerised mineral exports.
Through sealed containerisation, GPS tracking, and 24/7 security monitoring.
Yes, the infrastructure is adaptable for other high-value mineral exports.
Initial capacity is 20,000 tonnes of rare earth oxides per year, expandable as production increases.
Yes, in transport, warehouse operations, port services, and security.
Rail will handle most bulk loads, with road transport used for urgent or smaller consignments.
Mining & Resources (Package 3: Export Logistics Hub & Port Integration – Pilbara Rare Earths Extraction & Processing Facility)
- Min $150,000.00
- Max $500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-06-26
- Raised Amount$142,874.00
- Goal Amount$1,000,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT