Investment Case Details
Mining & Resources (Package 3 - Pilbara Rare Earths Extraction & Processing Facility)
A$294,519.00
A$1,852,392.00
| ⛏ | Co-invest in the export logistics hub and port integration — the market-access infrastructure that moves high-purity rare earth oxides to buyers across Asia, Europe, and North America. |
|
Daily accrual
~0.95%
per day
|
Annualised target
~347%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: 4QYF53D75N31 |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
With the mine operational (Package 1) and the processing plant producing high-purity rare earth oxides (Package 2), Package 3 delivers the export infrastructure required to move the final product to global markets.
This package establishes a dedicated logistics hub, containerised product storage, and integrated port facilities to handle the secure, efficient transport of rare earth minerals to buyers in Asia, Europe, and North America.
| 02 | Scope of Works |
Export logistics is the market-access enabler — without export infrastructure, sales to global buyers cannot occur. This stage provides direct access to Asia-Pacific and European high-tech manufacturing hubs, reduces turnaround times from processing to shipment, and delivers controlled, trackable logistics that meet international security and compliance standards.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and logistics hub site preparation |
| 2 | Containerised, climate-controlled storage construction |
| 3 | On-site rail loading terminal connection to freight lines |
| 4 | Heavy-duty trucking depot and maintenance bays |
| 5 | Port integration (berth space, cranes, handling equipment) |
| 6 | Security, RFID tracking, and customs compliance systems |
| 7 | Customs clearance offices and emergency response systems |
| 8 | Commissioning and first export shipments |
| 04 | Use of Funds |
| Containerised, climate-controlled storage facilities |
| On-site rail loading terminal |
| Heavy-duty trucking depot and fleet facilities |
| Port integration infrastructure (berths, cranes) |
| Security, RFID tracking, and surveillance systems |
| Customs clearance offices and documentation systems |
| Emergency response and hazardous material systems |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; port and rail interface coordination; export compliance and customs certification; commodity price and offtake variability; security and hazardous material handling; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🌏
Market Access Enabler
Without export infrastructure, sales to global buyers can't occur.
|
💰
Premium Market Reach
Direct access to Asia-Pacific and European high-tech manufacturing hubs.
|
|
⚙
Operational Efficiency
Reduces turnaround times from processing to shipment.
|
🔒
Security of Supply
Controlled, trackable logistics meet international security and compliance standards.
|
Comments
Review
Package 3 targets approximately 0.95% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 332% total over a typical 350-day cycle, equivalent to an annualised target of around 347%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$75,000 and extend up to A$500,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Export logistics and port integration infrastructure are the market-access layer of any resources operation — without storage, rail loading, trucking, and port handling capacity, high-purity rare earth oxides cannot reach the global buyers who pay premium prices. Infrastructure of this class combines durable civil assets (climate-controlled warehouses, rail terminals, port berths, and cranes with multi-decade lifespans) with security, RFID tracking, and customs systems that meet international compliance standards. Within this project, Package 3 unlocks direct access to Asia-Pacific, European, and North American high-tech manufacturing hubs, reducing turnaround time from processing to shipment and providing controlled, trackable logistics. The design is built for current throughput with capacity to scale as demand grows. As an asset class, export logistics infrastructure sits among the strategic categories of real-asset investment in resources, combining durable physical assets with direct exposure to global critical-minerals trade flows.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Mining & Resources (Package 3: Export Logistics Hub & Port Integration – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$75,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 3: Export Logistics Hub & Port Integration – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$75,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$294,519.00
- Goal AmountA$1,852,392.00
- Created At 2025-06-26