Investment Case Details
Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
A$53,182.00
A$250,000.00
Package Summary (Turbine & Generator Installation)
About Package 1
- Gas Turbines (x2) – High-efficiency industrial gas turbines engineered for fuel optimisation and low-emission output.
- Steam Turbine (x1) – Heat recovery integration enabling combined-cycle performance for maximum energy yield.
- Generator Units – Coupled with turbines, equipped with vibration monitoring and control systems for operational reliability.
- Heavy-Lift Logistics – Specialised transport and rigging from manufacturer to site, including oversized load handling.
- On-Site Installation & Alignment – Precision assembly, mechanical alignment, and integration into auxiliary systems.
- Commissioning & Testing – Comprehensive performance trials, safety certification, and grid-readiness verification.
Investment Details
- Investment Range: $400 – $20,000
- Daily ROI: ~0.65%
- Term: 300–400 days
- Annualised ROI: ~156%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual based on investment amount

Why Package 1 is Strategic
- Foundation of the Project – Without the turbines and generators, no power can be produced or sold.
- Immediate Revenue Activation – Enables early electricity sales to contracted industrial clients.
- Proven Technology – Combined-cycle gas plants are globally recognised for efficiency, reliability, and scalability.
- Long Asset Life – Turbines and generators have 25+ year operational lifespans with proper maintenance, ensuring stable long-term returns.
- High Barrier to Entry – The scale, cost, and complexity of turbine installation make this stage accessible only to major players, protecting competitive advantage.
Comments
Review
Yes. Each package is a standalone investment opportunity, although later packages are required for full facility operation.
Typically within weeks of commissioning, once grid connection and safety approvals are finalised.
The plant will run primarily on natural gas, with future adaptation potential for hydrogen co-firing.
Minimal, as the turbines are sourced from proven suppliers with established global service networks.
It uses waste heat from gas turbines to generate steam, powering an additional turbine without extra fuel burn.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Conventional Energy & Power (Package 1: Turbine & Generator Installation – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 350
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-07-10
- Raised AmountA$53,182.00
- Goal AmountA$250,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$83,148.00
0.95%
A$48,021.00
0.52%
