Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
RAISED
$53,182.00
GOAL
$250,000.00
Project Overview (Turbine & Generator Installation)
The Northwest Combined Cycle Gas Turbine (CCGT) Power Station is a large-scale conventional energy project designed to supply 1,200 MW of stable, base-load electricity to Western Australia’s industrial and regional grid. By using advanced combined-cycle technology, the facility captures waste heat from gas turbines to power a steam turbine, achieving fuel efficiencies of up to 60% and significantly reducing emissions compared to coal-fired plants.
While future packages will complete supporting systems and grid integration, Package 1 delivers the core power generation units — the beating heart of the station’s capacity. This stage is essential for securing early operational capability and revenue from long-term power purchase agreements with mining, manufacturing, and utility clients.
About Package 1
Package 1 covers the procurement, delivery, installation, and commissioning of the plant’s main generation assets:
- Gas Turbines (x2) – High-efficiency industrial gas turbines engineered for fuel optimisation and low-emission output.
- Steam Turbine (x1) – Heat recovery integration enabling combined-cycle performance for maximum energy yield.
- Generator Units – Coupled with turbines, equipped with vibration monitoring and control systems for operational reliability.
- Heavy-Lift Logistics – Specialised transport and rigging from manufacturer to site, including oversized load handling.
- On-Site Installation & Alignment – Precision assembly, mechanical alignment, and integration into auxiliary systems.
- Commissioning & Testing – Comprehensive performance trials, safety certification, and grid-readiness verification.
Investment Details
- Investment Range: $400 – $20,000
- Daily ROI: ~0.65%
- Term: 300–400 days
- Annualised ROI: ~156%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual based on investment amount

Why Package 1 is Strategic
- Foundation of the Project – Without the turbines and generators, no power can be produced or sold.
- Immediate Revenue Activation – Enables early electricity sales to contracted industrial clients.
- Proven Technology – Combined-cycle gas plants are globally recognised for efficiency, reliability, and scalability.
- Long Asset Life – Turbines and generators have 25+ year operational lifespans with proper maintenance, ensuring stable long-term returns.
- High Barrier to Entry – The scale, cost, and complexity of turbine installation make this stage accessible only to major players, protecting competitive advantage.
Comments
Review
Yes. Each package is a standalone investment opportunity, although later packages are required for full facility operation.
Typically within weeks of commissioning, once grid connection and safety approvals are finalised.
The plant will run primarily on natural gas, with future adaptation potential for hydrogen co-firing.
Minimal, as the turbines are sourced from proven suppliers with established global service networks.
It uses waste heat from gas turbines to generate steam, powering an additional turbine without extra fuel burn.
Conventional Energy & Power (Package 1: Turbine & Generator Installation – Northwest Combined Cycle Gas Turbine Power Station)
- Min $400.00
- Max $20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 350
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-07-10
- Raised Amount$53,182.00
- Goal Amount$250,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT
0.52%

Mining & Resources (Package 3 - Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$142,874.00
PROFIT