Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
RAISED
$48,236.00
GOAL
$500,000.00
Project Overview (Primary Irrigation Pipeline & Distribution Network)
Following the completion of storage and pumping infrastructure in Package 1, Package 2 delivers the arteries of the irrigation system — a high-capacity pipeline and distribution network that will deliver water efficiently to farmlands, processing facilities, and regional communities.
This package focuses on maximising delivery efficiency while minimising water loss from evaporation and seepage, ensuring every litre stored is put to productive use.

About Package 2
Package 2 covers the construction and installation of the region’s main irrigation supply network, including:
- Primary Pipelines – Large-diameter, corrosion-resistant pipelines designed for high-volume, long-distance water transport.
- Secondary Distribution Lines – Smaller branch lines delivering water to specific agricultural zones and industrial users.
- Pressure Management Systems – Valves, regulators, and automated controls to ensure consistent flow and prevent pipeline stress.
- Inline Filtration Units – Filtration systems at key junctions to prevent sediment build-up and protect equipment downstream.
- Remote Monitoring & Control – SCADA integration for real-time monitoring of pressure, flow, and water quality.
- Road & River Crossings – Engineered crossings to protect pipelines where they intersect with transport corridors or waterways.
Investment Details
- Investment Range: $600 – $35,000
- Daily ROI: ~0.50%
- Term: 300–360 days
- Annualised ROI: ~182%
- Investor Slots: 18 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 2 is Strategic
- Critical Link in the Chain – Transforms stored water into an operational supply system.
- Loss Prevention – Modern pipeline materials and pressure management reduce wastage.
- Operational Efficiency – Remote control allows operators to optimise flows instantly.
- Future Expansion Ready – Capacity and routing allow for future network extensions.
Comments
Review
No, it relies on the storage and pumping infrastructure established in Package 1.
The materials used have an expected lifespan of 50+ years with proper maintenance.
Inline filtration and sealed pipelines prevent contamination from external sources.
Yes, the distribution design includes multiple future connection points.
Minimal, as sealed pipelines prevent seepage into surrounding soil and reduce water extraction frequency.
Water Security (Package 2: Primary Irrigation Pipeline & Distribution Network – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
- Min $600.00
- Max $35,000.00
- Target daily ~ 0.50%
- Accrual days ~ 330
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-08-26
- Raised Amount$48,236.00
- Goal Amount$500,000.00
Recent Cases

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT
0.52%

Mining & Resources (Package 3 - Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$142,874.00
PROFIT