Investment Case Details
Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
A$167,438.00
A$583,410.00
| 💧 | Co-invest in the primary irrigation pipeline and distribution network — the arteries of the system that deliver stored water efficiently to farmlands, processing facilities, and regional communities across the Basin. |
|
Daily accrual
~0.50%
per day
|
Annualised target
~182%
over term
|
Term length
300–360
days
|
| ✓ | Case ID: U29ZBR61QCM1 |
| ✓ | Target term: 300–360 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Following the completion of storage and pumping infrastructure in Package 1, Package 2 delivers the arteries of the irrigation system — a high-capacity pipeline and distribution network that will deliver water efficiently to farmlands, processing facilities, and regional communities.
This package focuses on maximising delivery efficiency while minimising water loss from evaporation and seepage, ensuring every litre stored is put to productive use.
| 02 | Scope of Works |
The pipeline and distribution network is the critical link in the chain — transforming stored water into an operational supply system. Modern pipeline materials and pressure management reduce wastage, remote SCADA control lets operators optimise flows instantly, and the capacity and routing are future-expansion ready for network extensions.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and route survey |
| 2 | Primary pipeline laying (large-diameter) |
| 3 | Secondary distribution line installation |
| 4 | Pressure management system (valves, regulators) setup |
| 5 | Inline filtration unit installation |
| 6 | SCADA remote monitoring integration |
| 7 | Road and river crossings, commissioning |
| 04 | Use of Funds |
| Primary pipelines (large-diameter, corrosion-resistant) |
| Secondary distribution lines |
| Pressure management systems |
| Inline filtration units |
| Remote monitoring and control (SCADA) |
| Road and river crossings |
| Commissioning and testing |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; pipeline route, geotechnical, and crossing conditions; water allocation and environmental permitting; SCADA and equipment integration; flow and pressure performance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🔗
Critical Link in the Chain
Transforms stored water into an operational supply system.
|
💧
Loss Prevention
Modern pipeline materials and pressure management reduce wastage.
|
|
📡
Operational Efficiency
Remote control allows operators to optimise flows instantly.
|
🚀
Future Expansion Ready
Capacity and routing allow for future network extensions.
|
Comments
Review
Package 2 targets approximately 0.50% in daily accruals over an 11-month term (operating window 300–360 days) — translating to roughly 165% total over a typical 330-day cycle, equivalent to an annualised target of around 182%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$600 and extend up to A$35,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 11-month term (operating window 300–360 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Irrigation pipeline and distribution networks are the delivery arteries of any water security system — without large-diameter pipelines, pressure management, and distribution lines, stored water cannot reach the farmlands, processing facilities, and communities that depend on it. Infrastructure of this class uses corrosion-resistant pipelines built for high-volume, long-distance transport, with valves, regulators, and SCADA control enabling operators to optimise flow instantly and prevent pipeline stress. Modern materials and pressure management substantially reduce water loss from evaporation and seepage, ensuring every litre stored is put to productive use. Within the Murray-Darling Basin project, Package 2 transforms the storage backbone into an operational supply system, with capacity and routing designed for future network extensions. As an asset class, water distribution infrastructure sits among the most durable and standards-driven categories of real-asset investment in Australia, with revenue underpinned by essential, long-term agricultural and community water demand.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Water Security (Package 2: Primary Irrigation Pipeline & Distribution Network – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
- Min A$600.00
- Max A$35,000.00
- Target daily ~ 0.50%
- Accrual days ~ 330
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Water Security (Package 2: Primary Irrigation Pipeline & Distribution Network – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
- Min A$600.00
- Max A$35,000.00
- Target daily ~ 0.50%
- Accrual days ~ 330
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$167,438.00
- Goal AmountA$583,410.00
- Created At 2025-08-26