Investment Case Details
Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
A$48,847.00
A$500,000.00
Package Summary (Primary Irrigation Pipeline & Distribution Network)

About Package 2
- Primary Pipelines – Large-diameter, corrosion-resistant pipelines designed for high-volume, long-distance water transport.
- Secondary Distribution Lines – Smaller branch lines delivering water to specific agricultural zones and industrial users.
- Pressure Management Systems – Valves, regulators, and automated controls to ensure consistent flow and prevent pipeline stress.
- Inline Filtration Units – Filtration systems at key junctions to prevent sediment build-up and protect equipment downstream.
- Remote Monitoring & Control – SCADA integration for real-time monitoring of pressure, flow, and water quality.
- Road & River Crossings – Engineered crossings to protect pipelines where they intersect with transport corridors or waterways.
Investment Details
- Investment Range: $600 – $35,000
- Daily ROI: ~0.50%
- Term: 300–360 days
- Annualised ROI: ~182%
- Investor Slots: 18 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 2 is Strategic
- Critical Link in the Chain – Transforms stored water into an operational supply system.
- Loss Prevention – Modern pipeline materials and pressure management reduce wastage.
- Operational Efficiency – Remote control allows operators to optimise flows instantly.
- Future Expansion Ready – Capacity and routing allow for future network extensions.
Comments
Review
No, it relies on the storage and pumping infrastructure established in Package 1.
The materials used have an expected lifespan of 50+ years with proper maintenance.
Inline filtration and sealed pipelines prevent contamination from external sources.
Yes, the distribution design includes multiple future connection points.
Minimal, as sealed pipelines prevent seepage into surrounding soil and reduce water extraction frequency.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Water Security (Package 2: Primary Irrigation Pipeline & Distribution Network – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
- Min A$600.00
- Max A$35,000.00
- Target daily ~ 0.50%
- Accrual days ~ 330
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-08-26
- Raised AmountA$48,847.00
- Goal AmountA$500,000.00
Recent Cases
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%
A$48,021.00
0.52%