Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Infrastructure & Transport (Package 1 – Northern Freight Corridor Upgrade Project)
RAISED
$54,843.00
GOAL
$250,000.00
Project Overview (Earthworks & Base Preparation)
The Northern Freight Corridor Upgrade Project is a strategic transport initiative designed to boost freight efficiency, road safety, and regional connectivity.
Running through a key agricultural and mining belt, the upgraded corridor will cut travel times, reduce transport costs, and handle increased heavy-vehicle capacity for decades.
Package 1 lays the groundwork — literally — by completing all earthworks, grading, drainage, and base construction for the first 40 km section.

About Package 1
Package 1 includes:
- Land Clearing & Surveying – Removal of vegetation, debris, and old infrastructure, ensuring accurate alignment.
- Cut & Fill Earthworks – Balanced soil movement to achieve optimal road gradients.
- Subgrade Stabilisation – Adding lime or cement for long-lasting foundation strength.
- Drainage & Culverts – Installing stormwater control systems to protect against seasonal flooding.
- Road Base Layer Construction – Laying and compacting crushed rock for a stable, heavy-duty foundation.
Investment Details
- Investment Range: $500 – $25,000
- Daily ROI: ~0.48%
- Term: 260–340 days
- Annualised ROI: ~175%
- Investor Slots: 20 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 1 is Strategic
- Critical Start Point – No pavement or sealing work can begin without a stable base.
- Weather-Resilient – Engineered to withstand floods and heavy truck traffic.
- Long-Term Asset – Proper base preparation ensures decades of reduced maintenance costs.
- Regional Impact – Boosts freight and mining export efficiency immediately after completion.
Comments
Review
Yes, each package is standalone, though Package 1 is essential for all subsequent works.
Heavy machinery and local traffic can use it for access immediately after completion, but sealing will follow in later packages
Yes, the Northern Freight Corridor is part of a state and federal co-funded transport upgrade program.
With proper sealing in later stages, the subgrade and base can last over 30 years with minimal maintenance.
Infrastructure & Transport (Package 1: Earthworks & Base Preparation – Northern Freight Corridor Upgrade Project)
- Min $500.00
- Max $25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-04-11
- Raised Amount$54,843.00
- Goal Amount$250,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT