Investment Case Details
Infrastructure & Transport (Package 1 – Northern Freight Corridor Upgrade Project)
A$123,718.00
A$308,204.00
| 🛣 | Co-invest in the earthworks and base preparation stage of the Northern Freight Corridor Upgrade — the foundational civil works for a strategic 40 km freight corridor through Australia's agricultural and mining belt. |
|
Daily accrual
~0.48%
per day
|
Annualised target
~175%
over term
|
Term length
260–340
days
|
| ✓ | Case ID: 2E8OBWEGP68R |
| ✓ | Target term: 260–340 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Northern Freight Corridor Upgrade Project is a strategic transport initiative designed to boost freight efficiency, road safety, and regional connectivity. Running through a key agricultural and mining belt, the upgraded corridor will cut travel times, reduce transport costs, and handle increased heavy-vehicle capacity for decades.
Package 1 lays the groundwork — literally — by completing all earthworks, grading, drainage, and base construction for the first 40 km section.
| 02 | Scope of Works |
Earthworks and base preparation are the enabling layer for the entire corridor — no pavement or sealing work can begin without a stable base. Properly engineered subgrade and base layers can carry heavy freight traffic for 30+ years with reduced maintenance, supporting Australia's national freight strategy and the regional agricultural and mining economies that depend on it.
| 03 | Schedule & Milestones |
| 1 | Mobilisation, land clearing, and surveying |
| 2 | Cut and fill earthworks for optimal gradients |
| 3 | Subgrade stabilisation with lime or cement |
| 4 | Drainage system and culvert installation |
| 5 | Stormwater control verification |
| 6 | Road base layer construction and compaction |
| 7 | Quality assurance and handover to next packages |
| 04 | Use of Funds |
| Land clearing, vegetation removal, and surveying |
| Cut and fill earthworks and balanced soil movement |
| Subgrade stabilisation materials (lime, cement) |
| Drainage and culvert system installation |
| Crushed rock and base layer materials |
| Heavy equipment hire and operator labour |
| Compaction testing and quality assurance |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and soil conditions; weather and seasonal flooding; equipment procurement; environmental permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🏗
Critical Start Point
No pavement or sealing work can begin without a stable, engineered base.
|
🌧
Weather-Resilient
Engineered to withstand floods and heavy truck traffic.
|
|
⏳
Long-Term Asset
Proper base preparation ensures decades of reduced maintenance costs.
|
📦
Regional Impact
Boosts freight and mining export efficiency immediately after completion.
|
Comments
Review
Package 1 targets approximately 0.48% in daily accruals over a 10-month term (operating window 260–340 days) — translating to roughly 144% total over a typical 300-day cycle, equivalent to an annualised target of around 175%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$500 and extend up to A$25,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 260–340 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Earthworks and subgrade preparation form the enabling layer for every major road project in Australia. Without engineered grading, drainage, and base layer construction, no pavement, sealing, or tolling infrastructure can be installed. Civil works of this class have operational lifespans of 30+ years with minimal maintenance, and represent one of the lowest-risk phases of a major transport build because they involve no mechanical, electrical, or revenue-generating systems. Within the Northern Freight Corridor Upgrade, Package 1 establishes the physical base layer that every subsequent stage depends on, while securing early-stage exposure to a strategically positioned freight corridor servicing Australia's agricultural and mining export economies. As an asset class, road foundation infrastructure sits among the most stable categories of real-asset investment in Australia, with long lifespan and low operational complexity.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Infrastructure & Transport (Package 1: Earthworks & Base Preparation – Northern Freight Corridor Upgrade Project)
- Min A$500.00
- Max A$25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Infrastructure & Transport (Package 1: Earthworks & Base Preparation – Northern Freight Corridor Upgrade Project)
- Min A$500.00
- Max A$25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$123,718.00
- Goal AmountA$308,204.00
- Created At 2025-04-11