Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Waste & Recycling (Package 2 – Urban Circular Waste Hub)
RAISED
$134,832.00
GOAL
$500,000.00
Project Overview (Automated Sorting & Materials Recovery Facility (MRF) Installation)
Following the initial collection and pre-processing phase, Package 2 focuses on installing an advanced Automated Sorting & Materials Recovery Facility (MRF).
This stage ensures maximum material recovery, reduced landfill waste, and a high-quality feedstock for recycling and resale.
Using AI-driven optical sorters, magnetic separators, and precision conveyors, the MRF can process mixed waste streams at high speed, separating plastics, metals, glass, paper, and organics with industry-leading accuracy.

About Package 2
This package covers:
- AI Optical Sorting Systems – Cameras and sensors to identify materials by type, colour, and polymer composition.
- Magnetic & Eddy Current Separators – For ferrous and non-ferrous metal recovery.
- Air Classifiers & Trommel Screens – To remove lightweight contaminants and size materials efficiently.
- Automated Conveyors – Linking each stage to ensure a smooth, continuous operation.
- Quality Control Stations – Manual check-points for final inspection.
- Dust & Odour Control Systems – Maintaining compliance with health and safety standards.
Investment Details
- Investment Range: $1,200 – $30,000
- Daily ROI: ~0.52%
- Term: 220–300 days
- Annualised ROI: ~190%
- Investor Slots: 18 max
- Returns Type: Fixed daily accrual based on investment amount.

Why Package 2 is Strategic
- Maximises Material Recovery – Increases revenue from recyclable sales.
- Reduces Landfill Dependency – Cuts environmental impact and landfill fees.
- High Automation – Lowers operational costs while increasing throughput.
- Future-Proof Technology – Designed to handle evolving waste streams.
Comments
Review
Designed to handle 150–200 tonnes per day, scalable with demand.
Yes, AI models can be updated to recognise new waste types.
Yes, training is part of the installation package.
Core systems are sourced internationally, with local integration and support teams.
Waste & Recycling (Package 2: Automated Sorting & Materials Recovery Facility (MRF) Installation – Urban Circular Waste Hub)
- Min $1,200.00
- Max $30,000.00
- Target daily ~ 0.52%
- Accrual days ~ 280
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-27
- Raised Amount$134,832.00
- Goal Amount$500,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT