Investment Case Details
Conventional Energy & Power (Package 3 – Great Inland Pumped Hydro Energy Storage Project)
A$256,839.00
A$1,298,083.00
| ⚡ | Co-invest in the lower reservoir, grid connection and SCADA stage — the final activation phase of a 1,200 MW pumped hydro energy storage project. |
|
Daily accrual
~0.95%
per day
|
Annualised target
~347%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: 33EDFP4J4BNC |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Great Inland Pumped Hydro Energy Storage Project delivers long-duration, grid-scale storage by cycling water between two reservoirs at different elevations. Excess power is stored off-peak and dispatched at peak to stabilise supply from variable renewables.
Package 3 completes the system: builds the lower reservoir, connects the facility to the national grid, and deploys SCADA and control systems so the plant can respond to demand and operate safely and automatically.
| 02 | Scope of Works |
Package 3 is the revenue activation stage of the entire facility. Until the lower reservoir, grid connection and SCADA are in place, the plant cannot trade energy on the National Electricity Market. Grid assets such as transformers, switchyards and protection systems have service lives of 30–40 years and beyond, with regulated standards governing safety, reliability, and access to the market. With this stage complete, the project moves from construction to operating revenue.
| 03 | Schedule & Milestones |
| 1 | Design finalisation and long-lead procurement |
| 2 | Site civils and reservoir lining |
| 3 | Tailrace tunnel works |
| 4 | Transformer delivery and installation |
| 5 | Switchyard primary gear install |
| 6 | Protection and control panels, SCADA integration |
| 7 | Cable installation, terminations, testing |
| 8 | Grid protection clearance, commissioning, energisation |
| 04 | Use of Funds |
| Lower reservoir civils and lining |
| Tailrace tunnel completion |
| High-voltage switchyard and step-up transformers |
| Protection and control panels |
| SCADA and comms integration |
| Water management systems |
| Testing and commissioning to energisation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; equipment procurement and long-lead delivery; grid connection clearance and regulatory approvals; commissioning and energisation; counterparty and operational interfaces.
| ★ | Strategic Rationale |
|
💰
Revenue Activation
Enables dispatch and operating income once the facility is grid-ready.
|
🏭
High-Value Infrastructure
Durable grid assets with long service life across decades of operation.
|
|
📡
Automation & Efficiency
SCADA supports fast, safe operational response across the full plant.
|
📋
Regulatory Compliance
Meets market standards for grid integration and dispatch.
|
|
🛡
Operational Security
Protection schemes guard against faults and overloads, supporting reliable operation.
|
|
Comments
Review
Package 3 targets approximately 0.95% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 332% total over a typical 350-day cycle, equivalent to an annualised target of around 347%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$70,000 and extend up to A$500,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Grid connection assets are the revenue-activation layer of any large-scale energy storage facility — without high-voltage switchyards, step-up transformers and protection systems, the plant cannot trade energy on the National Electricity Market. Equipment of this class is built to long operating standards: transformers typically run for 30–40 years, switchyard primary gear and protection panels for 40 years and beyond, with regular maintenance cycles. SCADA and control systems automate dispatch and safety response across the facility, supporting frequency control ancillary services and capacity availability payments alongside energy arbitrage. As an asset class, grid-integration infrastructure sits among the most durable and standards-driven categories of real-asset investment in Australia, with revenue underpinned by long-term grid stabilisation demand as variable wind and solar capacity continues to grow.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Conventional Energy & Power (Package 3: Lower Reservoir, Grid Connection & SCADA Systems – Great Inland Pumped Hydro Energy Storage Project)
- Min A$70,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Conventional Energy & Power (Package 3: Lower Reservoir, Grid Connection & SCADA Systems – Great Inland Pumped Hydro Energy Storage Project)
- Min A$70,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$256,839.00
- Goal AmountA$1,298,083.00
- Created At 2025-04-15