Investment Case Details
Renewable & Green Energy (Package 3 – Outback Solar & Hydrogen Production Facility)
A$307,186.00
A$1,363,812.00
| ☀️ | Co-invest in the hydrogen production and storage stage — the commercial activation layer that converts solar power into storable, transportable green hydrogen for domestic use and export. |
|
Daily accrual
~0.95%
per day
|
Annualised target
~347%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: 3WOFMS8DPFGR |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Outback Solar & Hydrogen Production Facility is designed to position Australia as a global green hydrogen leader, leveraging vast solar resources to produce hydrogen at export scale. Package 3 activates the plant's core commercial function — converting solar power into storable, transportable green hydrogen.
This is the highest-value stage in the project, directly tied to long-term hydrogen supply contracts with both domestic industries and international buyers in Japan, South Korea, and Europe.
| 02 | Scope of Works |
Package 3 is the revenue activation stage of the entire facility — where solar power is converted into green hydrogen and sold to domestic and export buyers. Electrolyser and storage systems are high-value assets with operational lifespans exceeding 20 years, underpinning future revenue security through long-term offtake agreements at premium export prices.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and PEM electrolyser delivery |
| 2 | Water treatment and purification system installation |
| 3 | Electrolyser stack installation and tie-in to solar power |
| 4 | Compression and high-pressure storage tank assembly |
| 5 | Cryogenic liquid hydrogen handling systems |
| 6 | Loading infrastructure for road tankers and pipeline links |
| 7 | Automation, safety, and Australian hydrogen code compliance |
| 8 | Commissioning, performance testing, and first hydrogen production |
| 04 | Use of Funds |
| PEM electrolyser system procurement and installation |
| Water treatment and purification (reverse osmosis, deionisation) |
| Multi-stage hydrogen compression systems |
| High-pressure on-site storage tanks |
| Cryogenic liquid hydrogen handling units |
| Loading infrastructure for tankers and future pipelines |
| Automation, safety systems, and code compliance certification |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; electrolyser technology integration and stack performance; water supply and treatment; hydrogen safety code compliance; offtake counterparty performance; cost escalation; regulatory and operational dependencies.
| ★ | Strategic Rationale |
|
💰
Direct Revenue Link
Stage where hydrogen is produced and sold, creating immediate income streams.
|
🌏
Export Premium Pricing
International buyers pay significant premiums for Australian green hydrogen under long-term offtake.
|
|
📈
Global Growth Market
Green hydrogen demand projected to grow exponentially, with Australia positioned as a key supplier.
|
⏳
High Asset Value
Electrolysis and storage systems with lifespans exceeding 20 years.
|
Comments
Review
Package 3 targets approximately 0.95% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 332% total over a typical 350-day cycle, equivalent to an annualised target of around 347%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$60,000 and extend up to A$350,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Green hydrogen is one of the most strategically important asset classes in the global energy transition, with the international market projected to reach A$2.5 trillion by 2050 according to industry forecasts. Australia is uniquely positioned as a future leading supplier through its combination of high solar irradiance, vast land availability, and proximity to major Asian buyers including Japan, South Korea, and Europe-bound shipping routes. Proton exchange membrane (PEM) electrolyser stacks have commercial-scale operating lifespans of 20+ years with scheduled stack replacements, and supporting compression, storage, and loading infrastructure operates for decades under Australian hydrogen safety standards. Within this project, Package 3 captures the revenue-activation layer where green hydrogen is produced and sold to industrial and export offtakers at premium pricing. As an asset class, green hydrogen production infrastructure sits among the strategic categories of real-asset investment in Australia, with revenue underpinned by long-term policy support and rapidly growing global demand for low-carbon industrial inputs.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Renewable & Green Energy (Package 3: Hydrogen Production & Storage Systems – Outback Solar & Hydrogen Production Facility)
- Min A$60,000.00
- Max A$350,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Renewable & Green Energy (Package 3: Hydrogen Production & Storage Systems – Outback Solar & Hydrogen Production Facility)
- Min A$60,000.00
- Max A$350,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$307,186.00
- Goal AmountA$1,363,812.00
- Created At 2025-05-19