Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Renewable & Green Energy (Package 2 – Outback Solar & Hydrogen Production Facility)
RAISED
$62,141.00
GOAL
$500,000.00
Project Overview (Solar Array & Power Conversion Systems)
The Outback Solar & Hydrogen Production Facility is one of Australia’s flagship renewable energy ventures, combining gigawatt-scale solar power generation with on-site green hydrogen production. Located in an area with some of the highest solar irradiance on the planet, this facility will produce constant, clean energy to power its hydrogen electrolysers — without relying on fossil fuels.
The hydrogen produced will feed both export markets (Japan, South Korea, Europe) and domestic industries, ensuring stable long-term revenue streams.
While Package 1 focuses on preparing the site, Package 2 delivers the heartbeat of the project — the solar power infrastructure that feeds the entire hydrogen production cycle.

About Package 2
Package 2 covers the procurement, installation, and commissioning of the solar power generation and conversion systems.
Key works include:
- Installation of high-efficiency PV modules across a multi-hundred-hectare solar field.
- Tracker systems deployment for optimal sunlight capture throughout the day.
- Inverter stations to convert DC output to AC for plant use and grid connection.
- On-site substation build to regulate and distribute power to both the hydrogen plant and export lines.
- SCADA and monitoring systems for real-time performance tracking.
- Grid compliance and commissioning testing to ensure stable, safe power delivery.
This package transforms the prepared site from Package 1 into an active power generation hub capable of feeding high-demand hydrogen electrolysis operations.
Investment Details
- Investment Range: $5,000 – $35,000
- Daily ROI: ~0.65%
- Term: 280–360 days
- Annualised ROI: ~190%
- Investor Slots: 10 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 2 is Strategic
- Power Generation Backbone – Without the solar array, hydrogen production cannot occur; this is the most critical revenue-enabling stage.
- High-Return Phase – Energy production drives higher yields than civil works, making this a stronger short-term return play.
- Export-Linked Revenue – Solar power fuels hydrogen production, which is sold at premium rates in export markets.
Comments
Review
No. The site preparation and foundations from Package 1 are prerequisites for installing solar infrastructure.
High-efficiency bifacial panels designed for high heat tolerance and dust resistance — critical for outback conditions.
Yes. Any surplus power will be exported to the grid under long-term supply contracts.
All solar components carry manufacturer warranties exceeding 20 years, with performance degradation capped at <0.5% annually.
Renewable & Green Energy (Package 2: Solar Array & Power Conversion Systems – Outback Solar & Hydrogen Production Facility)
- Min $5,000.00
- Max $35,000.00
- Target daily ~ 0.65%
- Accrual days ~ 320
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-03
- Raised Amount$62,141.00
- Goal Amount$500,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT