Investment Case Details
Renewable & Green Energy (Package 2 – Outback Solar & Hydrogen Production Facility)
A$62,141.00
A$500,000.00
Package Summary (Solar Array & Power Conversion Systems)

About Package 2
- Installation of high-efficiency PV modules across a multi-hundred-hectare solar field.
- Tracker systems deployment for optimal sunlight capture throughout the day.
- Inverter stations to convert DC output to AC for plant use and grid connection.
- On-site substation build to regulate and distribute power to both the hydrogen plant and export lines.
- SCADA and monitoring systems for real-time performance tracking.
- Grid compliance and commissioning testing to ensure stable, safe power delivery.
Investment Details
- Investment Range: $5,000 – $35,000
- Daily ROI: ~0.65%
- Term: 280–360 days
- Annualised ROI: ~190%
- Investor Slots: 10 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 2 is Strategic
- Power Generation Backbone – Without the solar array, hydrogen production cannot occur; this is the most critical revenue-enabling stage.
- High-Return Phase – Energy production drives higher yields than civil works, making this a stronger short-term return play.
- Export-Linked Revenue – Solar power fuels hydrogen production, which is sold at premium rates in export markets.
Comments
Review
No. The site preparation and foundations from Package 1 are prerequisites for installing solar infrastructure.
High-efficiency bifacial panels designed for high heat tolerance and dust resistance — critical for outback conditions.
Yes. Any surplus power will be exported to the grid under long-term supply contracts.
All solar components carry manufacturer warranties exceeding 20 years, with performance degradation capped at <0.5% annually.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Renewable & Green Energy (Package 2: Solar Array & Power Conversion Systems – Outback Solar & Hydrogen Production Facility)
- Min A$5,000.00
- Max A$35,000.00
- Target daily ~ 0.65%
- Accrual days ~ 320
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-03
- Raised AmountA$62,141.00
- Goal AmountA$500,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%