Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Water Security (Package 1 – Coastal Desalination & Water Resilience Project)
RAISED
$72,645.00
GOAL
$250,000.00
Project Overview (Site Preparation & Seawater Intake Systems)
The Coastal Desalination & Water Resilience Project aims to secure a long-term, climate-independent water supply for coastal communities and industry by harnessing advanced seawater desalination technology.
While later packages will handle water treatment, distribution, and energy optimisation, Package 1 focuses on the foundation — preparing the site and installing high-capacity seawater intake systems to feed the desalination plant.
This stage ensures stable, clean seawater delivery with minimal environmental disruption, setting the stage for the plant’s operational success.

About Package 1
Package 1 covers all works required to prepare the site and establish the critical intake infrastructure, including:
- Marine Works – Construction of submerged intake pipelines with corrosion-resistant materials designed for decades of operation.
- Seawater Screening Stations – Automated, self-cleaning filters to prevent debris, marine life, and sediments from entering the system.
- Coastal Civil Works – Foundations for plant structures, access roads, and shoreline protection against storm surges.
- Pumping Facilities – High-efficiency intake pumps with variable speed drives for energy control.
- Environmental Protection Measures – Installation of fish-friendly intake heads, noise-reduction systems, and monitoring stations to ensure compliance with environmental impact standards.
Investment Details
- Investment Range: $400 – $20,000
- Daily ROI: ~0.45%
- Term: 250–320 days
- Annualised ROI: ~164%
- Investor Slots: 25 max
- Returns Type: Fixed daily accrual based on investment amount.

Why Package 1 is Strategic
- Foundation for the Entire Plant – Without the intake system, no desalination can occur.
- Long Asset Life – Marine pipelines and intake structures have 30+ year design lifespans.
- Environmental Compliance – Meets international marine protection standards, reducing operational risk.
- Scalable Capacity – Intake system is designed to support future plant expansions without major modifications.
Comments
Review
Yes, all packages are standalone opportunities, though Package 1 is essential for the project to function.
With proper maintenance, the system’s components can operate for over 30 years.
It uses fish-friendly intake heads, low-velocity flow rates, and continuous monitoring to protect marine life.
No, this package is focused on intake and coastal works — the treatment process is in later stages.
Yes, the system is engineered to handle increased flow rates for future plant expansions.
Water Security (Package 1: Site Preparation & Seawater Intake Systems – Coastal Desalination & Water Resilience Project)
- Min $400.00
- Max $20,000.00
- Target daily ~ 0.45%
- Accrual days ~ 280
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-04-26
- Raised Amount$72,645.00
- Goal Amount$250,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT