Investment Case Details
Water Security (Package 1 – Coastal Desalination & Water Resilience Project)
A$72,645.00
A$250,000.00
Package Summary (Site Preparation & Seawater Intake Systems)

About Package 1
- Marine Works – Construction of submerged intake pipelines with corrosion-resistant materials designed for decades of operation.
- Seawater Screening Stations – Automated, self-cleaning filters to prevent debris, marine life, and sediments from entering the system.
- Coastal Civil Works – Foundations for plant structures, access roads, and shoreline protection against storm surges.
- Pumping Facilities – High-efficiency intake pumps with variable speed drives for energy control.
- Environmental Protection Measures – Installation of fish-friendly intake heads, noise-reduction systems, and monitoring stations to ensure compliance with environmental impact standards.
Investment Details
- Investment Range: $400 – $20,000
- Daily ROI: ~0.45%
- Term: 250–320 days
- Annualised ROI: ~164%
- Investor Slots: 25 max
- Returns Type: Fixed daily accrual based on investment amount.

Why Package 1 is Strategic
- Foundation for the Entire Plant – Without the intake system, no desalination can occur.
- Long Asset Life – Marine pipelines and intake structures have 30+ year design lifespans.
- Environmental Compliance – Meets international marine protection standards, reducing operational risk.
- Scalable Capacity – Intake system is designed to support future plant expansions without major modifications.
Comments
Review
Yes, all packages are standalone opportunities, though Package 1 is essential for the project to function.
With proper maintenance, the system’s components can operate for over 30 years.
It uses fish-friendly intake heads, low-velocity flow rates, and continuous monitoring to protect marine life.
No, this package is focused on intake and coastal works — the treatment process is in later stages.
Yes, the system is engineered to handle increased flow rates for future plant expansions.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Water Security (Package 1: Site Preparation & Seawater Intake Systems – Coastal Desalination & Water Resilience Project)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.45%
- Accrual days ~ 280
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-04-26
- Raised AmountA$72,645.00
- Goal AmountA$250,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%