Investment Case Details
Infrastructure & Transport (Package 2 – National Freight Rail Expansion Project)
A$194,581.00
A$582,580.00
| 🚆 | Co-invest in the rail line construction and civil engineering stage — the physical backbone of the National Freight Rail Expansion, delivering the main corridor track to national heavy freight standards. |
|
Daily accrual
~0.62%
per day
|
Annualised target
~226%
over term
|
Term length
260–340
days
|
| ✓ | Case ID: 96NXENGP45G3 |
| ✓ | Target term: 260–340 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Following the successful completion of route surveying and land preparation in Package 1, Package 2 delivers the physical backbone of the National Freight Rail Expansion Project — the main rail corridor construction. This stage involves large-scale civil engineering, advanced track-laying, and integrated safety systems to ensure the corridor meets national heavy freight standards.
The goal is to create a durable, high-capacity rail link capable of handling Australia's growing bulk cargo demand for decades, while integrating with existing transport hubs.
| 02 | Scope of Works |
Rail line construction is the core asset creation stage — where the railway physically becomes operational. Properly maintained rail corridors with continuously welded rails and concrete sleepers last 30+ years before major refurbishment, meeting Australian Rail Track Corporation (ARTC) compliance and supporting axle loads of up to 30 tonnes for high-capacity bulk freight.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and formation grading |
| 2 | Earthworks, embankments, and cuttings for heavy-load operations |
| 3 | Ballast laying and concrete sleeper placement |
| 4 | Continuously welded rail installation |
| 5 | Bridge and culvert construction at crossings |
| 6 | Drainage and flood mitigation systems |
| 7 | Signal, sensor, and safety system integration |
| 8 | ARTC compliance testing and handover |
| 04 | Use of Funds |
| Earthworks, ground stabilisation, and formation grading |
| Ballast, concrete sleepers, and continuously welded rail |
| Bridge and culvert structures (concrete and steel) |
| Drainage and flood mitigation systems |
| Signal control and track sensor systems |
| Automated warning and communication systems |
| ARTC compliance testing and certification |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and ground conditions; weather and flooding; rail material supply and welding quality; ARTC compliance and certification; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🚧
Core Asset Creation
This is the stage where the railway physically becomes operational.
|
⏳
Long-Term Value
Rail corridors last decades with proper maintenance, offering stable returns.
|
|
🌏
Nationwide Impact
Improves national freight efficiency, reducing transport costs and carbon emissions.
|
📋
Regulatory Certainty
Meets Australian Rail Track Corporation (ARTC) compliance and safety standards.
|
Comments
Review
Package 2 targets approximately 0.62% in daily accruals over a 10-month term (operating window 260–340 days) — translating to roughly 192% total over a typical 310-day cycle, equivalent to an annualised target of around 226%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$5,000 and extend up to A$50,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 260–340 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Rail track infrastructure is the core operational asset of any freight rail network. Continuously welded rail, concrete sleepers, and precision-laid ballast are engineered for operational lifespans of 30+ years before major refurbishment, and are built to carry axle loads of up to 30 tonnes for high-capacity bulk freight. Track and civil structures of this class are constructed to Australian Rail Track Corporation (ARTC) standards, providing regulatory certainty and access to the national freight network. Within the National Freight Rail Expansion Project, Package 2 delivers the stage where the railway physically becomes operational — the asset that carries revenue-generating freight for decades. As an asset class, rail track infrastructure sits among the most durable categories of real-asset investment in Australia, with long lifespan, regulated access, and demand underpinned by the nation's growing bulk cargo and export economies.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Infrastructure & Transport (Package 2: Rail Line Construction & Civil Engineering Works – National Freight Rail Expansion Project)
- Min A$5,000.00
- Max A$50,000.00
- Target daily ~ 0.62%
- Accrual days ~ 310
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Infrastructure & Transport (Package 2: Rail Line Construction & Civil Engineering Works – National Freight Rail Expansion Project)
- Min A$5,000.00
- Max A$50,000.00
- Target daily ~ 0.62%
- Accrual days ~ 310
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$194,581.00
- Goal AmountA$582,580.00
- Created At 2025-06-08