Investment Case Details
Conventional Energy & Power (Package 3 – Northwest Combined Cycle Gas Turbine Power Station)
A$261,752.00
A$1,574,390.00
| ⚡ | Co-invest in the grid integration and control systems stage — the revenue-activation layer that connects the 1,200 MW CCGT facility to Western Australia's high-voltage grid. |
|
Daily accrual
~0.95%
per day
|
Annualised target
~347%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: A2S8AKFFMHFJ |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Northwest Combined Cycle Gas Turbine (CCGT) Power Station will supply 1,200 MW of reliable electricity to Western Australia's industrial corridor and regional grid. Using advanced combined-cycle technology, the plant achieves up to 60% efficiency, reducing fuel consumption and emissions compared to conventional coal-fired stations.
Package 3 completes the final step — connecting the facility to the high-voltage grid and enabling full operational control. This stage allows the plant to reliably deliver contracted power to industrial clients and utilities while meeting grid stability requirements and safety regulations.
| 02 | Scope of Works |
Package 3 is the revenue activation stage of the entire facility — without grid integration, no electricity can be sold. Substation and SCADA infrastructure operates under regulated standards governing safety, reliability, and market access, with service lives of 30+ years and well-defined maintenance cycles. AEMO compliance ensures the plant can dispatch power under long-term contracts and respond to grid frequency requirements across Western Australia's industrial corridor.
| 03 | Schedule & Milestones |
| 1 | Design finalisation and long-lead procurement |
| 2 | High-voltage substation civils and structures |
| 3 | Transformer delivery and installation |
| 4 | Switchyard primary gear and protection panels |
| 5 | SCADA and communications infrastructure integration |
| 6 | Control room fit-out and operator console setup |
| 7 | AEMO compliance testing and grid synchronisation |
| 8 | Commissioning and energisation |
| 04 | Use of Funds |
| High-voltage substation construction and transformers |
| Grid synchronisation equipment |
| SCADA systems and control room servers |
| Protection and safety relay panels |
| Communication infrastructure (fibre and wireless) |
| Control room fit-out and operator consoles |
| AEMO compliance testing, commissioning, and energisation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; equipment procurement and long-lead delivery; grid connection clearance and AEMO compliance; commissioning and energisation timing; cybersecurity and communications integrity; counterparty and operational interfaces.
| ★ | Strategic Rationale |
|
💰
Revenue Activation Point
Without grid integration, no electricity can be sold to customers.
|
📡
Operational Control
SCADA and control systems enable safe, efficient, and responsive plant operation.
|
|
📋
Regulatory Compliance
Meets strict Australian grid standards, supporting long-term, stable operation.
|
⏳
High Asset Longevity
Substation and control infrastructure have lifespans of 30+ years with routine maintenance.
|
Comments
Review
Package 3 targets approximately 0.95% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 332% total over a typical 350-day cycle, equivalent to an annualised target of around 347%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$67,000 and extend up to A$500,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Grid integration assets are the revenue-activation layer of any large-scale power facility — without high-voltage substations, synchronisation equipment, and protection systems, the plant cannot trade electricity on Western Australia's grid. Equipment of this class is built to long operating standards: transformers typically run for 30–40 years, switchyard primary gear and protection panels for 40 years and beyond, with scheduled maintenance cycles. SCADA and control systems automate dispatch and safety response across the facility, supporting compliance with AEMO grid standards and enabling delivery of long-term power purchase agreements. The architecture is also extensible for future integration of battery storage, hydrogen co-firing, or hybrid renewable systems. As an asset class, grid-integration infrastructure sits among the most durable and standards-driven categories of real-asset investment in Australia.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Conventional Energy & Power (Package 3: Grid Integration & Control Systems – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$67,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Conventional Energy & Power (Package 3: Grid Integration & Control Systems – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$67,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$261,752.00
- Goal AmountA$1,574,390.00
- Created At 2025-05-08