Conventional Energy & Power (Package 3 – Northwest Combined Cycle Gas Turbine Power Station)
A$152,842.00
A$1,000,000.00
Package Summary (Grid Integration & Control Systems)
About Package 3
- High-Voltage Substation Construction – Including transformers, busbars, and protection systems for safe and stable transmission.
- Grid Synchronisation Equipment – Systems to match plant output to grid frequency and voltage requirements.
- Advanced SCADA Systems – Supervisory control and data acquisition for real-time monitoring, diagnostics, and optimisation.
- Protection & Safety Relays – Automated shutdown and isolation systems to prevent equipment damage or grid instability.
- Communication Infrastructure – Secure fibre and wireless links for control room operations, remote monitoring, and compliance reporting.
- Control Room Fit-Out – Operator consoles, redundant servers, and climate-controlled IT equipment enclosures.
- Commissioning & Compliance Testing – Ensuring the plant meets all Australian Energy Market Operator (AEMO) standards for grid connection.
Investment Details
- Investment Range: $150,000 – $500,000
- Daily ROI: ~0.95%
- Term: 300–400 days
- Annualised ROI: ~236%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual based on investment amount

Why Package 3 is Strategic
- Revenue Activation Point – Without grid integration, no electricity can be sold to customers.
- Operational Control – SCADA and control systems enable safe, efficient, and responsive plant operation.
- Regulatory Compliance – Meets strict Australian grid standards, allowing long-term, stable operation.
- High Asset Longevity – Substation and control infrastructure have lifespans of 30+ years with routine maintenance.
- Investor Impact – This package transforms the facility from a construction project into a functioning revenue generator.
Comments
Review
No. It requires the generation capacity from Package 1 and the efficiency systems from Package 2.
Immediately after successful grid compliance testing and commissioning.
Yes, minimal annual maintenance and compliance reporting, factored into operational budgets.
Yes. The SCADA and substation design allow for future integration of renewable and hybrid systems.
Through SCADA systems, providing real-time data to operators, investors, and regulatory bodies.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Conventional Energy & Power (Package 3: Grid Integration & Control Systems – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$150,000.00
- Max A$500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-08
- Raised AmountA$152,842.00
- Goal AmountA$1,000,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%