Conventional Energy & Power (Package 3 – Northwest Combined Cycle Gas Turbine Power Station)
RAISED
$152,842.00
GOAL
$1,000,000.00
Project Overview (Grid Integration & Control Systems)
The Northwest Combined Cycle Gas Turbine (CCGT) Power Station will supply 1,200 MW of reliable electricity to Western Australia’s industrial corridor and regional grid. Using advanced combined-cycle technology, the plant achieves up to 60% efficiency, reducing fuel consumption and emissions compared to conventional coal-fired stations.
While Packages 1 and 2 deliver the power generation hardware and efficiency systems, Package 3 completes the final step — connecting the facility to the high-voltage grid and enabling full operational control. This stage ensures the plant can reliably deliver contracted power to industrial clients and utilities, while maintaining compliance with grid stability requirements and safety regulations.
About Package 3
Package 3 covers the engineering, installation, and commissioning of all electrical, control, and safety systems needed for grid connection and plant management:
- High-Voltage Substation Construction – Including transformers, busbars, and protection systems for safe and stable transmission.
- Grid Synchronisation Equipment – Systems to match plant output to grid frequency and voltage requirements.
- Advanced SCADA Systems – Supervisory control and data acquisition for real-time monitoring, diagnostics, and optimisation.
- Protection & Safety Relays – Automated shutdown and isolation systems to prevent equipment damage or grid instability.
- Communication Infrastructure – Secure fibre and wireless links for control room operations, remote monitoring, and compliance reporting.
- Control Room Fit-Out – Operator consoles, redundant servers, and climate-controlled IT equipment enclosures.
- Commissioning & Compliance Testing – Ensuring the plant meets all Australian Energy Market Operator (AEMO) standards for grid connection.
Investment Details
- Investment Range: $150,000 – $500,000
- Daily ROI: ~0.95%
- Term: 300–400 days
- Annualised ROI: ~236%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual based on investment amount

Why Package 3 is Strategic
- Revenue Activation Point – Without grid integration, no electricity can be sold to customers.
- Operational Control – SCADA and control systems enable safe, efficient, and responsive plant operation.
- Regulatory Compliance – Meets strict Australian grid standards, allowing long-term, stable operation.
- High Asset Longevity – Substation and control infrastructure have lifespans of 30+ years with routine maintenance.
- Investor Impact – This package transforms the facility from a construction project into a functioning revenue generator.
Comments
Review
No. It requires the generation capacity from Package 1 and the efficiency systems from Package 2.
Immediately after successful grid compliance testing and commissioning.
Yes, minimal annual maintenance and compliance reporting, factored into operational budgets.
Yes. The SCADA and substation design allow for future integration of renewable and hybrid systems.
Through SCADA systems, providing real-time data to operators, investors, and regulatory bodies.
Conventional Energy & Power (Package 3: Grid Integration & Control Systems – Northwest Combined Cycle Gas Turbine Power Station)
- Min $150,000.00
- Max $500,000.00
- Target daily ~ 0.95%
- Accrual days ~ 350
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-08
- Raised Amount$152,842.00
- Goal Amount$1,000,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT