Investment Case Details
Mining & Resources (Package 2 – Coral Coast Deepwater Mining Project)
A$194,736.00
A$541,204.00
| ⛏ | Co-invest in the onshore processing and refining plant — the value-addition stage that turns raw marine-mined nodules into high-purity cobalt, nickel, and rare earth products for export. |
|
Daily accrual
~0.80%
per day
|
Annualised target
~292%
over term
|
Term length
250–350
days
|
| ✓ | Case ID: B3ED2ZCEKHZD |
| ✓ | Target term: 250–350 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
With seabed mineral extraction launched in Package 1, Package 2 focuses on building the onshore processing and refining facility that turns raw marine-mined nodules into high-purity cobalt, nickel, and rare earth products for export.
Located at a coastal industrial zone near the mining vessel's port, the plant will use advanced hydrometallurgical methods to extract metals efficiently while meeting strict environmental standards.
| 02 | Scope of Works |
Onshore processing and refining is the value-addition stage — increasing revenue by producing export-grade cobalt, nickel, and rare earth products that meet the high-spec demands of EV battery and electronics manufacturers. State-of-the-art wastewater treatment ensures compliance with global ESG standards, while local plant operations deliver a significant regional employment boost.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and coastal plant site preparation |
| 2 | Ore reception and stockpile facility construction |
| 3 | Primary processing line (crushing, washing, separation) |
| 4 | Hydrometallurgical plant (leaching, solvent extraction) |
| 5 | Wastewater treatment and recycling systems |
| 6 | Laboratories and QA/QC facility fit-out |
| 7 | Material handling, packaging, and commissioning |
| 04 | Use of Funds |
| Ore reception and stockpile facilities |
| Primary processing line (crushing, washing, separation) |
| Hydrometallurgical plant (leaching, solvent extraction) |
| Wastewater treatment and recycling systems |
| Laboratories and QA/QC facilities |
| Material handling and packaging systems |
| Commissioning and quality verification |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; processing technology integration and recovery rates; commodity price variability; wastewater and environmental compliance; permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💎
Value Addition
Increases revenue by producing export-grade products.
|
🌏
Market Access
Meets high-spec demands of EV battery and electronics manufacturers.
|
|
🌱
Environmental Edge
State-of-the-art treatment ensures compliance with global ESG standards.
|
👷
Local Jobs
Significant employment boost in plant operations and logistics.
|
Comments
Review
Package 2 targets approximately 0.80% in daily accruals over a 10-month term (operating window 250–350 days) — translating to roughly 240% total over a typical 300-day cycle, equivalent to an annualised target of around 292%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$20,000 and extend up to A$200,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 250–350 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Mineral processing and refining plants are the value-addition core of any resources operation — the stage where raw marine-mined nodules are transformed into high-purity cobalt, nickel, and rare earth products that command export-grade pricing. Facilities of this class use hydrometallurgical methods (leaching, solvent extraction, precipitation) to recover metals at the purity levels demanded by electric vehicle battery and advanced electronics manufacturers. Processing infrastructure substantially increases the revenue captured per tonne of ore compared with selling raw material, while wastewater treatment and recycling systems ensure compliance with global ESG standards. Within this project, Package 2 captures the margin-expansion stage, supported by on-site laboratories and QA/QC for grade control. As an asset class, mineral processing infrastructure sits among the higher-value categories of real-asset investment in resources, with revenue underpinned by rising global demand for battery and clean energy metals.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Mining & Resources (Package 2: Onshore Processing & Refining Plant – Coral Coast Deepwater Mining Project)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.80%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 2: Onshore Processing & Refining Plant – Coral Coast Deepwater Mining Project)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.80%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$194,736.00
- Goal AmountA$541,204.00
- Created At 2025-04-25