Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Water Security (Package 2 – Northern Inland Water Security Program)
RAISED
$74,823.00
GOAL
$500,000.00
Project Overview (Water Treatment & Purification Facilities)
Following the establishment of the dam and reservoir in Package 1, Package 2 focuses on constructing a modern water treatment complex to process stored water into high-quality, potable supply. This stage ensures safe drinking water for towns, industry, and agriculture in the Northern Inland region.
About Package 2
Scope of Works:
- Filtration Plants – Multi-stage filtration using sand, activated carbon, and membrane systems.
- Disinfection Units – Ultraviolet, ozone, and chlorination systems for pathogen elimination.
- Sludge & Residual Management – Safe handling, drying, and disposal of treatment waste.
- Chemical Storage & Dosing Systems – For pH control and corrosion prevention.
- SCADA-Integrated Controls – For real-time performance and quality monitoring.
- Energy Efficiency Measures – Integration of solar-assisted pumping and smart motors.
Investment Details
- Investment Range: $20,000 – $200,000
- Daily ROI: ~0.5%
- Term: 250–350 days
- Annualised ROI: ~182%
- Investor Slots: 25 max
- Returns Type: Fixed daily accrual.
Why Package 2 is Strategic
- Public Health Impact – Guarantees safe water meeting WHO and Australian standards.
- High-Tech Operation – Automation reduces operational costs and errors.
- Scalable for Growth – Modular design allows capacity expansion as demand increases.
- Compliance Advantage – Aligns with strict state water quality regulations.
Comments
Review
Yes, dedicated processing lines will handle agricultural and industrial requirements separately.
Continuous monitoring via SCADA plus manual lab verification daily.
Designed for 35–40 years with standard maintenance.
Solar and energy recovery systems will reduce grid dependency by up to 40%.
Water Security (Package 2: Water Treatment & Purification Facilities – Northern Inland Water Security Program)
- Min $20,000.00
- Max $200,000.00
- Target daily ~ 0.50%
- Accrual days ~ 320
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-03-28
- Raised Amount$74,823.00
- Goal Amount$500,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT