Investment Case Details
Mining & Resources(Package 2 – Red Earth Copper Project)
A$178,539.00
A$518,402.00
| ⛏ | Co-invest in the copper ore processing plant — the revenue engine that transforms raw ore into high-grade copper concentrate ready for sale to global smelters. |
|
Daily accrual
~0.80%
per day
|
Annualised target
~292%
over term
|
Term length
250–320
days
|
| ✓ | Case ID: DDCPTQR3GJ8H |
| ✓ | Target term: 250–320 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Package 2 transforms the raw ore extracted in Package 1 into high-grade copper concentrate, ready for sale to smelters. This phase involves the construction, commissioning, and optimisation of a dedicated copper processing facility capable of handling thousands of tonnes of ore per day.
The plant will use proven crushing, grinding, and flotation technology to maximise recovery rates and ensure consistent quality output that meets global industry standards. This stage not only adds immediate revenue potential but also significantly boosts the overall value of the Red Earth Copper Project.
| 02 | Scope of Works |
The processing plant is the revenue engine of the project — converting low-value raw ore into high-value concentrate directly marketable to global smelters. Advanced processing ensures maximum copper yield from each tonne mined, with the facility designed for future capacity upgrades to support long-term throughput growth.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and plant site preparation |
| 2 | Primary and secondary crusher installation |
| 3 | Ball mill and grinding circuit construction |
| 4 | Flotation cell installation and commissioning |
| 5 | Thickening and filtration system fit-out |
| 6 | Water recycling system installation |
| 7 | Automation and control room integration |
| 8 | Commissioning and quality optimisation |
| 04 | Use of Funds |
| Primary and secondary crushers |
| Ball mill and grinding circuits |
| Flotation cells |
| Thickening and filtration systems |
| Water recycling systems |
| Automation and control room |
| Commissioning and optimisation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; processing technology integration and recovery rates; copper price variability; water and environmental compliance; permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
⚙
Revenue Engine
Converts low-value raw ore into high-value concentrate.
|
📊
High Recovery Rates
Advanced processing ensures maximum copper yield from each tonne mined.
|
|
🌏
Market-Ready Product
Produces concentrate directly marketable to global smelters.
|
🚀
Scalable Operations
Facility designed for future capacity upgrades.
|
Comments
Review
Package 2 targets approximately 0.80% in daily accruals over a 9-month term (operating window 250–320 days) — translating to roughly 220% total over a typical 275-day cycle, equivalent to an annualised target of around 292%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$20,000 and extend up to A$200,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 250–320 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Copper processing plants are the revenue engine of any mining operation — the stage where low-value raw ore is transformed into high-grade concentrate that smelters pay premium prices for. Facilities of this class use proven crushing, grinding, and flotation technology to maximise recovery rates and produce a consistent, market-ready product meeting global industry standards. Processing infrastructure substantially increases the revenue captured per tonne of ore compared with selling raw material, while water recycling systems reduce both environmental impact and operating costs. Within the Red Earth Copper Project, Package 2 captures the value-conversion stage, with the facility designed for future capacity upgrades. As an asset class, mineral processing infrastructure sits among the higher-value categories of real-asset investment in resources, with revenue underpinned by strong global demand for copper concentrate from the electrification and renewable energy sectors.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Mining & Resources (Package 2: Copper Ore Processing Plant – Red Earth Copper Project)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.80%
- Accrual days ~ 275
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 2: Copper Ore Processing Plant – Red Earth Copper Project)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.80%
- Accrual days ~ 275
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$178,539.00
- Goal AmountA$518,402.00
- Created At 2025-05-06