Investment Case Details
Mining & Resources (Package 2 – Pilbara Rare Earths Extraction & Processing Facility)
A$119,549.00
A$517,216.00
| ⛏ | Co-invest in the rare earth processing plant and separation systems — the value-addition stage that converts raw ore into high-purity rare earth oxides ready for sale to global markets. |
|
Daily accrual
~0.85%
per day
|
Annualised target
~310%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: E9UQ2DN7OSSH |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
With the open-pit mine developed in Package 1, Package 2 establishes the processing and separation plant that turns raw ore into high-purity rare earth oxides ready for sale to global markets. This facility will use cutting-edge beneficiation and hydrometallurgical processes to separate valuable elements like neodymium, praseodymium, and dysprosium from other minerals, ensuring the highest possible recovery rates.
Located adjacent to the mine for logistical efficiency, the plant will be built to meet export-grade specifications demanded by the electric vehicle, renewable energy, and advanced electronics sectors.
| 02 | Scope of Works |
Rare earth processing is the value-addition stage — upgrading raw ore into high-purity products that meet strict international buyer specifications. On-site processing reduces transport costs and turnaround time, while state-of-the-art waste handling ensures long-term environmental stewardship. The plant is built to export-grade specifications for the electric vehicle, renewable energy, and advanced electronics sectors.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and plant site preparation |
| 2 | Beneficiation circuit installation (crushing, grinding, magnetic separation) |
| 3 | Flotation and leaching unit construction |
| 4 | Hydrometallurgical processing plant (solvent extraction, precipitation) |
| 5 | Waste management systems (tailings dams, lined ponds) |
| 6 | Laboratory and quality control facility fit-out |
| 7 | Material handling, storage, and SCADA integration |
| 8 | Commissioning and export-grade quality verification |
| 04 | Use of Funds |
| Beneficiation circuit (crushing, grinding, magnetic separation) |
| Flotation and leaching units |
| Hydrometallurgical processing plant (solvent extraction) |
| Waste management systems (tailings dams, neutralisation) |
| Laboratory and quality control facilities |
| Material handling, storage, and conveyors |
| Automation and plant-wide SCADA systems |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; processing technology integration and recovery rates; commodity price variability; tailings and waste management compliance; environmental permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💎
Value Addition
Increases revenue by upgrading raw ore into high-purity products.
|
🌏
Market Access
Meets strict international buyer specifications for purity and consistency.
|
|
⚙
Operational Efficiency
On-site processing reduces transport costs and turnaround time.
|
🌱
Environmental Compliance
State-of-the-art waste handling ensures long-term environmental stewardship.
|
Comments
Review
Package 2 targets approximately 0.85% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 297% total over a typical 350-day cycle, equivalent to an annualised target of around 310%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$20,000 and extend up to A$200,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Rare earth processing and separation plants are the value-addition core of any critical minerals operation — the stage where raw ore is transformed into high-purity oxides that command export-grade pricing. Facilities of this class use beneficiation circuits and hydrometallurgical processes (solvent extraction, precipitation) to isolate neodymium, praseodymium, and dysprosium at the purity levels demanded by electric vehicle, renewable energy, and advanced electronics manufacturers. Processing infrastructure substantially increases the revenue captured per tonne of ore compared with selling raw concentrate, while on-site location reduces transport costs and turnaround time. Within this project, Package 2 captures the margin-expansion stage, supported by tailings dams, neutralisation facilities, and SCADA-based quality control that meet Australian environmental standards. As an asset class, mineral processing infrastructure sits among the higher-value categories of real-asset investment in resources, with revenue underpinned by rising global demand for high-purity rare earth oxides.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Mining & Resources (Package 2: Rare Earth Processing Plant & Separation Systems – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.85%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 2: Rare Earth Processing Plant & Separation Systems – Pilbara Rare Earths Extraction & Processing Facility)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.85%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$119,549.00
- Goal AmountA$517,216.00
- Created At 2025-05-23