Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Mining & Resources (Package 2 – Pilbara Rare Earths Extraction & Processing Facility)
RAISED
$107,438.00
GOAL
$500,000.00
Project Overview (Rare Earth Processing Plant & Separation Systems)
With the open-pit mine developed in Package 1, Package 2 establishes the processing and separation plant that turns raw ore into high-purity rare earth oxides ready for sale to global markets. This facility will use cutting-edge beneficiation and hydrometallurgical processes to separate valuable elements like neodymium, praseodymium, and dysprosium from other minerals, ensuring the highest possible recovery rates. Located adjacent to the mine for logistical efficiency, the plant will be built to meet export-grade specifications demanded by the electric vehicle, renewable energy, and advanced electronics sectors.
Scope of work includes:
About Package 2- Beneficiation Circuit Installation – Crushing, grinding, and magnetic separation systems to concentrate rare earth minerals.
- Flotation & Leaching Units – Advanced separation processes to isolate high-value minerals from waste rock.
- Hydrometallurgical Processing Plant – Solvent extraction and precipitation systems to produce high-purity rare earth oxides.
- Waste Management Systems – Tailings dams, lined waste ponds, and neutralisation facilities for safe disposal.
- Laboratory & Quality Control Facilities – On-site labs for rapid testing and grade verification.
- Material Handling & Storage – Covered stockpiles, conveyors, and secure container loading bays.
- Automation & Monitoring Systems – Plant-wide SCADA for efficiency, safety, and quality control.
Investment Details
- Investment Range: $20,000 – $200,000
- Daily ROI: ~0.85%
- Term: 300–400 days
- Annualised ROI: ~204%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual
Why Package 2 is Strategic
- Value Addition – Increases revenue by upgrading raw ore into high-purity products.
- Market Access – Meets strict international buyer specifications for purity and consistency.
- Operational Efficiency – On-site processing reduces transport costs and turnaround time.
- Environmental Compliance – State-of-the-art waste handling ensures long-term environmental stewardship.
- Global Demand Growth – Rare earth consumption is expected to rise sharply over the next decade.
Comments
Review
On-site processing significantly increases product value and reduces shipping volumes.
The plant is designed to produce >99% purity rare earth oxides.
Yes, they are handled in controlled systems with strict safety protocols and waste neutralisation.
Approximately 25 hectares, including tailings and storage areas.
A mix of local hires and specialist engineers experienced in rare earth processing.
Yes, the plant layout allows for modular expansion if market demand increases.
Yes, all relevant export permits and environmental clearances will be secured before commissioning.
Mining & Resources (Package 2: Rare Earth Processing Plant & Separation Systems – Pilbara Rare Earths Extraction & Processing Facility)
- Min $20,000.00
- Max $200,000.00
- Target daily ~ 0.85%
- Accrual days ~ 350
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-23
- Raised Amount$107,438.00
- Goal Amount$500,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT