Investment Case Details
Mining & Resources (Package 1 – Coral Coast Deepwater Mining Project)
A$61,538.00
A$298,320.00
| ⛏ | Co-invest in the seabed mineral extraction stage — the offshore mining infrastructure for a pioneering deepwater project recovering cobalt, nickel, and rare earths from a high-grade polymetallic nodule belt off the Western Australian coast. |
|
Daily accrual
~0.45%
per day
|
Annualised target
~164%
over term
|
Term length
200–300
days
|
| ✓ | Case ID: EXCJVYFJDUEK |
| ✓ | Target term: 200–300 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Coral Coast Deepwater Mining Project is a pioneering offshore resources initiative designed to tap into Australia's undersea mineral wealth. Located along a high-grade polymetallic nodule belt off the Western Australian coast, the project focuses on the sustainable extraction of cobalt, nickel, and rare earth elements — critical for the global clean energy transition.
Package 1 establishes the offshore mining infrastructure, enabling large-scale, environmentally monitored seabed operations. This phase sets the foundation for mineral recovery and onshore processing in subsequent packages.
| 02 | Scope of Works |
Seabed mineral extraction infrastructure is the enabling layer for the entire offshore operation — without mining vehicles, the positioning vessel, and lift systems, no minerals can be recovered. Offshore minerals remain largely untapped in Australia, giving early participants a first-mover position in critical minerals (cobalt, nickel, rare earths) essential for EVs, wind turbines, and electronics, with demand surging across Asian markets.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and offshore site survey |
| 2 | Seafloor mining vehicle deployment (1,500m+ depth) |
| 3 | Dynamic positioning vessel commissioning |
| 4 | Flexible riser and lift system installation |
| 5 | Onboard initial processing (screening, washing) setup |
| 6 | Environmental monitoring array deployment |
| 7 | Operational testing and handover to processing stage |
| 04 | Use of Funds |
| Seafloor mining vehicles (remote-operated collectors) |
| Dynamic positioning vessel |
| Flexible riser and lift / pumping systems |
| Onboard initial processing (screening, washing) |
| Environmental monitoring array |
| Marine compliance and regulatory works |
| Operational testing and commissioning |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; deepwater marine and weather conditions; offshore mining technology and equipment integration; commodity price variability; marine environmental permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🚀
First-Mover Advantage
Offshore minerals are still largely untapped in Australia.
|
🔋
Critical Mineral Demand
Cobalt, nickel, and rare earths are essential for EVs, wind turbines, and electronics.
|
|
🌱
Eco-Compliance & Reputation
The project uses cutting-edge low-impact extraction methods.
|
🌏
Export Premium
Demand for marine-mined minerals is surging in the Asian market.
|
Comments
Review
Package 1 targets approximately 0.45% in daily accruals over an 8-month term (operating window 200–300 days) — translating to roughly 112% total over a typical 250-day cycle, equivalent to an annualised target of around 164%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$500 and extend up to A$20,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 8-month term (operating window 200–300 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Offshore seabed mining is one of the most strategically distinctive frontiers in critical minerals, recovering cobalt, nickel, and rare earth elements from high-grade polymetallic nodules that lie largely untapped in Australian waters. Infrastructure of this class — remote-operated seafloor collectors operating beyond 1,500m depth, dynamic-positioning vessels, and riser-lift systems — creates productive offshore assets supported by real-time environmental monitoring designed to meet Australian ocean mining regulations. Cobalt, nickel, and rare earths are essential inputs for electric vehicle batteries, wind turbines, and advanced electronics, with demand surging across Asian markets. Within this project, Package 1 establishes the extraction base that every later processing and export stage depends on, while securing a first-mover position in an emerging Australian resource frontier. As an asset class, offshore mining infrastructure sits among the higher-growth categories of real-asset investment in resources, with exposure to the global clean energy transition.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Mining & Resources (Package 1: Seabed Mineral Extraction – Coral Coast Deepwater Mining Project)
- Min A$500.00
- Max A$20,000.00
- Target daily ~ 0.45%
- Accrual days ~ 250
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 1: Seabed Mineral Extraction – Coral Coast Deepwater Mining Project)
- Min A$500.00
- Max A$20,000.00
- Target daily ~ 0.45%
- Accrual days ~ 250
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$61,538.00
- Goal AmountA$298,320.00
- Created At 2025-04-15