Investment Case Details
Infrastructure & Transport (Package 3 – Major Highway Expansion & Resilience Project)
A$126,743.00
A$1,000,000.00
Package Summary (Intelligent Transport Systems & Final Surface Works)
About Package 3
- Intelligent Transport Systems (ITS) – Installation of traffic monitoring cameras, real-time variable message signs, and weather detection sensors for proactive traffic management.
- Electronic Tolling Infrastructure – Fully automated toll gantries integrated with nationwide toll networks.
- Final Road Surfacing – Application of high-grade asphalt and polymer-modified binders designed for heavy load-bearing and extreme weather conditions.
- Road Markings & Safety Barriers – High-visibility thermoplastic markings and upgraded crash barriers to meet latest safety standards.
- Smart Lighting Systems – Energy-efficient LED lighting with adaptive brightness control for visibility and reduced energy consumption.
- Environmental Offsets – Landscaping with native vegetation along the highway to reduce erosion and improve visual amenity.
Investment Details
- Investment Range: $5,000 – $250,000
- Daily ROI: ~0.55%
- Term: 220–300 days
- Annualised ROI: ~201%
- Investor Slots: 20 max
- Returns Type: Fixed daily accrual.

Why Package 3 is Strategic
- Final Step Before Full Operation – Delivers the highway in a ready-to-use, revenue-generating state.
- Technology-Driven Efficiency – ITS improves safety, reduces congestion, and lowers maintenance costs.
- Long-Term Durability – Premium surfacing materials significantly reduce the frequency of repairs.
- Revenue Generation – Tolling systems create a continuous income stream post-construction
Comments
Review
Yes, once operational, tolling systems can start generating revenue from day one.
With polymer-modified binders, the surface is designed to last 15–20 years with minimal maintenance.
ITS ensures real-time monitoring, faster incident response, and smoother traffic flow.
Yes, native vegetation planting is included as part of the environmental offset strategy.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Infrastructure & Transport (Package 3: Intelligent Transport Systems & Final Surface Works – Major Highway Expansion & Resilience Project)
- Min A$5,000.00
- Max A$250,000.00
- Target daily ~ 0.55%
- Accrual days ~ 275
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-03-19
- Raised AmountA$126,743.00
- Goal AmountA$1,000,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%
