Investment Case Details
Infrastructure & Transport (Package 3 – Major Highway Expansion & Resilience Project)
A$231,849.00
A$1,891,302.00
| 🛣 | Co-invest in the Intelligent Transport Systems and final surface works stage — the technology and revenue-activation layer that transitions the highway into a fully operational, toll-generating corridor. |
|
Daily accrual
~0.55%
per day
|
Annualised target
~201%
over term
|
Term length
220–300
days
|
| ✓ | Case ID: FN4S4R16VHPN |
| ✓ | Target term: 220–300 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The final phase of the Major Highway Expansion & Resilience Project focuses on integrating advanced Intelligent Transport Systems (ITS) and delivering a durable, high-performance road surface. This ensures not only safe and efficient travel but also optimises traffic flow, reduces congestion, and extends the road's operational lifespan.
This package is critical in transitioning the newly built highway sections into a fully operational, future-ready transport corridor capable of handling Australia's increasing freight and commuter demands.
| 02 | Scope of Works |
Package 3 is the revenue activation stage of the entire corridor — where tolling, ITS, and the final wearing surface come together to make the highway operationally and commercially live. Premium surfacing materials are designed to last 15–20 years with minimal maintenance, and electronic tolling gantries generate continuous revenue from day one of operation.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and ITS equipment delivery |
| 2 | Traffic monitoring cameras and variable message sign installation |
| 3 | Electronic tolling gantry installation and integration |
| 4 | Final asphalt and polymer-modified surfacing |
| 5 | Road markings, crash barriers, and safety lining |
| 6 | Smart LED lighting system installation |
| 7 | Environmental offset landscaping |
| 8 | Commissioning, network integration, and revenue activation |
| 04 | Use of Funds |
| ITS equipment (cameras, sensors, message signs) |
| Electronic tolling gantries and network integration |
| Final road surfacing materials (polymer-modified binders) |
| Thermoplastic road markings and crash barriers |
| Smart LED lighting systems |
| Environmental offset landscaping |
| Commissioning and toll network activation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; ITS equipment delivery and integration; toll network compliance and certification; weather and material variability; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💰
Revenue Generation
Tolling systems create a continuous income stream from day one of operation.
|
📡
Technology-Driven Efficiency
ITS improves safety, reduces congestion, and lowers maintenance costs.
|
|
⏳
Long-Term Durability
Premium surfacing materials significantly reduce the frequency of repairs.
|
🏁
Final Step Before Full Operation
Delivers the highway in a ready-to-use, revenue-generating state.
|
Comments
Review
Package 3 targets approximately 0.55% in daily accruals over a 9-month term (operating window 220–300 days) — translating to roughly 151% total over a typical 275-day cycle, equivalent to an annualised target of around 201%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 3 start at A$5,000 and extend up to A$250,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 220–300 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Intelligent Transport Systems (ITS) and electronic tolling are the revenue and operational-efficiency layer of any modern toll-road project in Australia. Electronic tolling gantries integrate with nationwide networks to generate continuous user-pays revenue from day one of operation, while ITS components — traffic cameras, variable message signs, and weather sensors — reduce congestion, improve incident response, and lower long-term maintenance costs. Premium polymer-modified surfacing on tolled corridors is designed for service lives of 15–20 years with minimal resurfacing, and ITS and tolling assets are typically structured under long-term concession or availability arrangements with state and federal transport agencies. As an asset class, smart transport infrastructure sits among the more strategic categories of real-asset investment in Australia, combining durable civil assets with direct revenue streams from user-pays tolling.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 3, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 3 remains available only while allocation capacity is open.
Infrastructure & Transport (Package 3: Intelligent Transport Systems & Final Surface Works – Major Highway Expansion & Resilience Project)
- Min A$5,000.00
- Max A$250,000.00
- Target daily ~ 0.55%
- Accrual days ~ 275
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Infrastructure & Transport (Package 3: Intelligent Transport Systems & Final Surface Works – Major Highway Expansion & Resilience Project)
- Min A$5,000.00
- Max A$250,000.00
- Target daily ~ 0.55%
- Accrual days ~ 275
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$231,849.00
- Goal AmountA$1,891,302.00
- Created At 2025-03-19