Investment Case Details
Waste & Recycling (Package 2 – Advanced Recycling Infrastructure Project)
A$86,583.00
A$528,191.00
| ♻️ | Co-invest in the waste sorting and material recovery systems — the AI-driven, high-speed separation stage that recovers high-value materials for reuse, resale, or further processing. |
|
Daily accrual
~0.55%
per day
|
Annualised target
~201%
over term
|
Term length
220–300
days
|
| ✓ | Case ID: K7V4JY9R4HGP |
| ✓ | Target term: 220–300 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Advanced Recycling Infrastructure Project is designed to drastically reduce landfill dependency by maximising material recovery and resource circularity. While Package 1 covers waste intake and pre-processing, Package 2 focuses on the sorting and separation phase, where high-value materials are recovered for reuse, resale, or further processing.
This package deploys AI-driven, high-speed sorting technology capable of identifying and separating multiple waste streams — plastics, metals, glass, paper, organics — with unmatched precision.
| 02 | Scope of Works |
Waste sorting and material recovery is the revenue-driving stage — recovered materials generate significant resale value, with AI-driven systems delivering high purity and throughput. High automation reduces labour costs and increases efficiency, while the facility meets or exceeds Australian waste diversion and recycling targets.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and facility preparation |
| 2 | AI optical sorting machine installation |
| 3 | Magnetic and eddy current separator setup |
| 4 | Glass cleaning and crushing unit build |
| 5 | Conveyor and transfer system integration |
| 6 | Automated quality control system commissioning |
| 7 | Throughput and purity verification |
| 04 | Use of Funds |
| AI optical sorting machines (near-infrared, colour) |
| Magnetic and eddy current separators |
| Glass cleaning and crushing units |
| Conveyor and transfer systems |
| Automated quality control sensors |
| Material storage bays |
| Commissioning and calibration |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; sorting technology integration and recovery purity; recovered-material price and offtake variability; throughput consistency; environmental and recycling compliance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
💰
Revenue Driver
Material recovery generates significant resale value.
|
🚀
Scalable
Lines can be expanded or upgraded for future capacity increases.
|
|
🤖
High Automation
Reduces labour costs and increases throughput efficiency.
|
📋
Regulatory Alignment
Meets or exceeds Australian waste diversion and recycling targets.
|
Comments
Review
Package 2 targets approximately 0.55% in daily accruals over a 9-month term (operating window 220–300 days) — translating to roughly 154% total over a typical 280-day cycle, equivalent to an annualised target of around 201%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$600 and extend up to A$25,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 220–300 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Automated material recovery systems are the revenue-driving core of any advanced recycling operation — the stage where mixed waste streams are separated into clean, high-value commodities for reuse, resale, or remanufacturing. Infrastructure of this class deploys AI optical sorting (near-infrared and colour recognition), magnetic and eddy current separators, and glass cleaning units to recover plastics, ferrous and non-ferrous metals, paper, and furnace-ready glass cullet with high purity. High automation reduces labour costs and increases throughput, directly improving the resale value captured per tonne processed. Within the Advanced Recycling Infrastructure Project, Package 2 captures the separation stage that converts waste into saleable material, while meeting or exceeding Australian waste diversion and recycling targets. As an asset class, material recovery infrastructure sits among the higher-value categories of real-asset investment in the circular economy, with revenue underpinned by demand for recovered commodities and regulatory recycling mandates.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Waste & Recycling (Package 2: Waste Sorting & Material Recovery Systems – Advanced Recycling Infrastructure Project)
- Min A$600.00
- Max A$25,000.00
- Target daily ~ 0.55%
- Accrual days ~ 280
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Waste & Recycling (Package 2: Waste Sorting & Material Recovery Systems – Advanced Recycling Infrastructure Project)
- Min A$600.00
- Max A$25,000.00
- Target daily ~ 0.55%
- Accrual days ~ 280
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$86,583.00
- Goal AmountA$528,191.00
- Created At 2025-04-08