Investment Case Details
Mining & Resources (Package 1 – Red Earth Copper Project)
A$79,861.00
A$285,354.00
| ⛏ | Co-invest in the open-pit copper mine development — the foundational mine-site, haul roads, and extraction equipment for a large-scale copper project in one of Australia's richest copper belts. |
|
Daily accrual
~0.65%
per day
|
Annualised target
~237%
over term
|
Term length
200–250
days
|
| ✓ | Case ID: KRUXR5NEF572 |
| ✓ | Target term: 200–250 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Red Earth Copper Project is a large-scale open-pit mining development located in one of Australia's richest copper belts. This package focuses on establishing the mine site, constructing haul roads, and deploying the initial extraction equipment to prepare for high-volume copper ore output. Copper is critical in global electrification, renewable energy infrastructure, and electronics manufacturing — with demand projected to rise sharply over the next two decades.
Package 1 lays the groundwork for all subsequent stages, ensuring safe and efficient access to high-grade copper reserves and positioning the site for continuous ore extraction.
| 02 | Scope of Works |
Open-pit mine development is the enabling layer for the entire project — all future revenue from copper extraction depends on the successful completion of this phase. This positions investors at the most cost-efficient stage, with the investment linked directly to physical mining infrastructure and exposure to surging global copper demand from the electric vehicle and renewable energy boom.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and site clearing |
| 2 | Overburden removal to access ore-rich zones |
| 3 | Haul road and pit access development |
| 4 | Excavation machinery and blasting system deployment |
| 5 | Initial ore stockpile zone preparation |
| 6 | Water supply and dust suppression installation |
| 7 | Worker accommodation and site facility setup |
| 04 | Use of Funds |
| Site clearing and overburden removal |
| Haul road and pit access development |
| Excavation and blasting equipment |
| Initial ore stockpile preparation |
| Water supply and dust suppression systems |
| Worker accommodation and site facilities |
| Environmental compliance works |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and ore-body conditions; copper price variability; environmental and mining permitting; heavy equipment procurement; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🚀
Early Entry Advantage
Positions investors at the most cost-efficient stage of the project.
|
📈
Global Demand Surge
Copper prices expected to rise due to the electric vehicle and renewable energy boom.
|
|
⛏
Asset-Backed Security
Investment linked directly to physical mining infrastructure.
|
🏗
Foundation Stage
All future revenue from copper extraction depends on this phase.
|
Comments
Review
Package 1 targets approximately 0.65% in daily accruals over a 7-month term (operating window 200–250 days) — translating to roughly 146% total over a typical 225-day cycle, equivalent to an annualised target of around 237%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$400 and extend up to A$20,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 7-month term (operating window 200–250 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Open-pit mine development and ore-handling infrastructure form the enabling layer for any copper operation — without site clearing, haul roads, excavation equipment, and stockpile zones, no ore can be extracted or processed. Civil and earthmoving works of this class create long-life productive assets, with developed mines generating returns across many years of operation. Copper is one of the most strategically important industrial metals in the global energy transition, essential to electrification, renewable energy infrastructure, electric vehicles, and electronics manufacturing, with demand projected to rise sharply over the next two decades. Within the Red Earth Copper Project, Package 1 establishes the physical mining base that every later processing and export stage depends on, while positioning participants at the most cost-efficient entry stage. As an asset class, mine development infrastructure sits among the foundational categories of real-asset investment in resources, with long productive life and direct exposure to surging copper demand.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Mining & Resources (Package 1: Open-Pit Copper Mine Development – Red Earth Copper Project)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 225
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Mining & Resources (Package 1: Open-Pit Copper Mine Development – Red Earth Copper Project)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 225
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$79,861.00
- Goal AmountA$285,354.00
- Created At 2025-03-25