Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Mining & Resources (Package 1 – Red Earth Copper Project)
RAISED
$53,621.00
GOAL
$250,000.00
Gotcha — I’ll bring the full structure back exactly like before, with proper Project Overview → About Package → Investment Details → Why Package is Strategic → FAQs.
Here’s the revised Package 1 for the copper project with expanded FAQ section so it’s consistent with our previous best format.
Project Overview (Open-Pit Copper Mine Development)
The Red Earth Copper Project is a large-scale open-pit mining development located in one of Australia’s richest copper belts. This package focuses on establishing the mine site, constructing haul roads, and deploying the initial extraction equipment to prepare for high-volume copper ore output. Copper is critical in global electrification, renewable energy infrastructure, and electronics manufacturing — with demand projected to rise sharply over the next two decades.
Package 1 lays the groundwork for all subsequent stages, ensuring safe and efficient access to high-grade copper reserves and positioning the site for continuous ore extraction.

About Package 1
This package covers the core setup and early-stage mining readiness works:
- Site Clearing & Overburden Removal – Clearing vegetation and removing non-mineral layers to access ore-rich zones.
- Haul Road & Pit Access Development – Construction of heavy-duty access routes for mine trucks and equipment.
- Excavation & Blasting Setup – Deployment of excavation machinery and safe blasting systems to loosen ore-bearing rock.
- Initial Ore Stockpile Preparation – Establishment of secure zones for temporary ore storage.
- Water Supply & Dust Suppression – Installation of pumping and misting systems for operational safety and environmental compliance.
- Worker Accommodation & Site Facilities – On-site offices, safety stations, and staff housing.
Investment Details
- Investment Range: $400 – $20,000
- Daily ROI: ~0.65%
- Term: 200–250 days
- Annualised ROI: ~158%
- Investor Slots: 20 max
- Returns Type: Fixed daily accrual based on investment amount.

Why Package 1 is Strategic
- Early Entry Advantage – Positions investors at the most cost-efficient stage of the project.
- Global Demand Surge – Copper prices expected to rise due to the electric vehicle and renewable energy boom.
- Asset-Backed Security – Investment linked directly to physical mining infrastructure.
- Foundation Stage – All future revenue from copper extraction depends on the successful completion of this phase.
Comments
Review
Yes. Each package is a standalone opportunity, though later stages may offer higher returns.
Preliminary geological surveys indicate an average ore grade of 1.2% copper, which is considered high for large-scale mining.
Yes. The climate allows continuous operations with minimal seasonal downtime.
Within weeks of completion, as Package 2 processing facilities are deployed.
Like all commodities, copper prices fluctuate, but current forecasts indicate sustained upward trends due to global electrification demand.
Mining & Resources (Package 1: Open-Pit Copper Mine Development – Red Earth Copper Project)
- Min $400.00
- Max $20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 225
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-03-25
- Raised Amount$53,621.00
- Goal Amount$250,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT