Investment Case Details
Renewable & Green Energy (Package 2 – Southern Coast Tidal Energy Project)
A$187,962.00
A$527,145.00
| 🌊 | Co-invest in the turbine assembly and offshore installation stage — the heart of the tidal energy system, where advanced corrosion-resistant turbines convert moving water into grid-ready electricity. |
|
Daily accrual
~0.65%
per day
|
Annualised target
~237%
over term
|
Term length
280–360
days
|
| ✓ | Case ID: KU65JUP4689T |
| ✓ | Target term: 280–360 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Southern Coast Tidal Energy Project continues its mission to harness Australia's rich tidal flows for consistent, predictable green power. After the deployment of reinforced turbine bases in Package 1, Package 2 focuses on the heart of the system — the turbine units themselves.
This phase brings the site to life by integrating advanced, corrosion-resistant tidal turbines engineered for maximum efficiency in the Southern Ocean's unique conditions. Once installed, these turbines begin converting the power of moving water into grid-ready electricity, marking the transition from foundational construction to active energy generation.
| 02 | Scope of Works |
Turbine assembly and offshore installation is the revenue-enabling stage of the entire facility — without operating turbines, no electricity can be generated. Modern tidal turbines carry operational lifespans of 25+ years in submerged service, with predictable lunar-driven flows eliminating the weather dependency of wind and solar generation.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and turbine procurement |
| 2 | Onshore assembly and pre-deployment testing |
| 3 | Heavy-lift vessel deployment to site |
| 4 | ROV-assisted turbine placement onto Package 1 bases |
| 5 | Generator, rotor, and drive shaft final integration |
| 6 | Subsea cabling to onshore substation |
| 7 | Initial commissioning and operational testing |
| 04 | Use of Funds |
| High-efficiency tidal turbine procurement |
| Onshore assembly and testing facilities |
| Heavy-lift offshore vessels and ROV services |
| Generator housings, rotor blades, and drive shafts |
| Corrosion-resistant materials and coatings |
| Subsea cabling to shore-based substation |
| Commissioning and operational testing |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; marine weather and tidal window constraints; turbine equipment delivery and integration; subsea cable installation; commissioning and grid-readiness verification; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
⚡
Direct Energy Generation
Investment funds the stage that starts producing electricity from tidal flows.
|
📈
Higher Yield Potential
Returns linked to direct turbine operation and project revenue.
|
|
🎯
Mid-Project Entry Point
Reduced construction risk with higher operational upside.
|
⏳
Long Asset Life
Cutting-edge turbine systems with operational lifespans of 25+ years.
|
Comments
Review
Package 2 targets approximately 0.65% in daily accruals over an 11-month term (operating window 280–360 days) — translating to roughly 208% total over a typical 320-day cycle, equivalent to an annualised target of around 237%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$5,000 and extend up to A$35,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 11-month term (operating window 280–360 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Tidal turbines are among the most strategically distinctive renewable energy assets available, generating electricity twice a day, every day, on lunar gravitational cycles that are entirely predictable years in advance. Equipment of this class is engineered for operational lifespans of 25+ years in submerged service, with corrosion-resistant materials and ROV-supported maintenance regimes designed to minimise downtime. Unlike wind and solar, tidal generation requires no daylight, no wind, and no weather conditions — making it one of the most secure forms of renewable baseload available to the Australian grid. Within this project, Package 2 delivers the active generation hardware that drives revenue. As an asset class, tidal turbine infrastructure sits among the strategic categories of real-asset investment in Australia, with revenue underpinned by predictable flow patterns and long-term offtake demand for stable renewable baseload power.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Renewable & Green Energy (Package 2: Turbine Assembly & Offshore Installation – Southern Coast Tidal Energy Project)
- Min A$5,000.00
- Max A$35,000.00
- Target daily ~ 0.65%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Renewable & Green Energy (Package 2: Turbine Assembly & Offshore Installation – Southern Coast Tidal Energy Project)
- Min A$5,000.00
- Max A$35,000.00
- Target daily ~ 0.65%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$187,962.00
- Goal AmountA$527,145.00
- Created At 2025-05-24