Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Waste & Recycling (Package 1 – Urban Circular Economy Project)
RAISED
$207,315.00
GOAL
$1,000,000.00
Project Overview (Advanced Materials Recovery Facility (MRF) Construction)
The Urban Circular Economy Project is designed to tackle growing landfill pressures in major Australian cities by recovering valuable resources from municipal and commercial waste streams.
While later stages will focus on advanced processing and product manufacturing, Package 1 lays the groundwork with the construction of a high-capacity Materials Recovery Facility (MRF) capable of sorting, cleaning, and preparing recyclables for re-entry into supply chains.
The facility will integrate state-of-the-art automation to increase recovery rates and reduce contamination, directly supporting national waste reduction targets.

About Package 1
This stage covers all works required to construct and commission the core MRF infrastructure, including:
- Civil Works – Site clearing, earthworks, drainage, and building foundations.
- Facility Construction – Steel-frame buildings with energy-efficient roofing, skylights, and natural ventilation systems.
- Sorting Lines – Installation of conveyor systems, ballistic separators, and magnet-based metal extraction.
- Optical Sorting Technology – High-speed cameras and AI-driven scanners to separate plastics by type and colour.
- Dust & Odour Control Systems – Fully enclosed negative-pressure zones with industrial air filtration.
Investment Details
- Investment Range: $500 – $25,000
- Daily ROI: ~0.52%
- Term: 200–300 days
- Annualised ROI: ~190%
- Investor Slots: 20 max
- Returns Type: Fixed daily accrual based on investment amount.

Why Package 1 is Strategic
- Foundation of the Circular Economy Model – Without the MRF, no downstream recycling or product manufacturing can occur.
- High-Value Material Recovery – Capable of processing over 250 tonnes/day of mixed waste.
- Automation Reduces Labour Costs – Advanced sorting reduces manual handling and increases throughput.
- Regulatory Alignment – Meets or exceeds Australian Standards for waste processing and emissions.
- Expansion Ready – Facility layout allows for future technology upgrades without major reconstruction.
Comments
Review
Yes, it is designed to process mixed municipal solid waste (MSW) and source-separated recyclables.
Initial modelling shows up to 80% diversion from landfill once operational.
It combines automation with targeted manual quality control for maximum recovery rates.
Yes, the roof will host a solar array capable of meeting up to 40% of operational energy needs.
Yes, the modular design allows for additional sorting lines and advanced recovery modules in future.
Waste & Recycling (Package 1: Advanced Materials Recovery Facility (MRF) Construction – Urban Circular Economy Project)
- Min $500.00
- Max $25,000.00
- Target daily ~ 0.52%
- Accrual days ~ 250
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-17
- Raised Amount$207,315.00
- Goal Amount$1,000,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT