Investment Case Details
Waste & Recycling (Package 2 – Marine Waste-to-Energy & Water Recovery Project)
A$186,447.31
A$518,249.00
| ♻️ | Co-invest in the gasification and integrated desalination plant — the core production stage that converts collected marine waste into renewable electricity and clean potable water in a single integrated facility. |
|
Daily accrual
~0.65%
per day
|
Annualised target
~237%
over term
|
Term length
270–360
days
|
| ✓ | Case ID: QQQVM6GK2YUS |
| ✓ | Target term: 270–360 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
Package 2 is the heart of the Marine Waste-to-Energy & Water Recovery Project. This stage converts the collected marine waste and biomass from Package 1 into renewable electricity and clean potable water through advanced thermal gasification and heat-recovery desalination processes.
By combining these two systems in one facility, the project maximises resource efficiency and minimises emissions.
| 02 | Scope of Works |
Package 2 is the core production stage — where the project actually produces both electricity and water, turning marine waste into saleable power and potable water. Advanced scrubbing technology ensures compliance with strict environmental standards, while the integrated design delivers dual revenue streams: electricity sales to the grid plus potable water supply contracts.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and plant site preparation |
| 2 | High-temperature gasification unit installation |
| 3 | Waste heat recovery system construction |
| 4 | MSF and RO desalination train installation |
| 5 | Emission scrubbing and filtration systems |
| 6 | Automated AI-driven control system integration |
| 7 | Commissioning, energy output, and water purity testing |
| 04 | Use of Funds |
| High-temperature gasification units |
| Waste heat recovery systems |
| MSF and RO desalination trains |
| Emission scrubbing and filtration |
| Automated control systems (AI monitoring) |
| Environmental compliance and certification |
| Commissioning and optimisation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; gasification and desalination technology integration; feedstock supply consistency; emissions and environmental compliance; offtake performance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
⚡
Core Production Stage
Where the project actually produces both electricity and water.
|
♻️
Waste-to-Value Conversion
Turns marine waste into saleable power and potable water.
|
|
🌱
Low Emissions
Advanced scrubbing technology ensures compliance with strict environmental standards.
|
💰
Dual Revenue Streams
Electricity sales to the grid + potable water supply contracts.
|
Comments
Review
Package 2 targets approximately 0.65% in daily accruals over a 10-month term (operating window 270–360 days) — translating to roughly 202% total over a typical 310-day cycle, equivalent to an annualised target of around 237%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$1,000 and extend up to A$50,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 270–360 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Integrated waste-to-energy and desalination plants are the production core of a circular-economy operation — converting collected marine waste into two saleable outputs, renewable electricity and potable water, within a single facility. Thermal gasification turns organic waste and plastics into syngas for power generation while avoiding open-air incineration, and waste-heat recovery powers hybrid MSF and reverse-osmosis desalination, maximising resource efficiency. Emission scrubbing and filtration ensure compliance with strict environmental standards. The dual-output design creates two independent revenue streams — grid electricity sales and potable water supply contracts — which diversifies income and strengthens long-term revenue security. Within this project, Package 2 captures the value-conversion stage where waste becomes power and water. As an asset class, waste-to-energy and desalination infrastructure sits among the strategic categories of real-asset investment in Australia, combining clean energy generation, water security, and environmental compliance.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Waste & Recycling (Package 2: Gasification & Integrated Desalination Plant – Marine Waste-to-Energy & Water Recovery Project)
- Min A$1,000.00
- Max A$5,000.00
- Target daily ~ 0.65%
- Accrual days ~ 310
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Waste & Recycling (Package 2: Gasification & Integrated Desalination Plant – Marine Waste-to-Energy & Water Recovery Project)
- Min A$1,000.00
- Max A$5,000.00
- Target daily ~ 0.65%
- Accrual days ~ 310
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$186,447.31
- Goal AmountA$518,249.00
- Created At 2025-06-13