Investment Case Details
Waste & Recycling (Package 2 – Marine Waste-to-Energy & Water Recovery Project)
A$48,531.00
A$500,000.00
Package Summary (Gasification & Integrated Desalination Plant)

About Package 2
- High-Temperature Gasification Units – Converts organic waste and plastics into syngas for electricity generation, avoiding open-air incineration.
- Waste Heat Recovery Systems – Captures heat from gasification to power the desalination process.
- Multi-Stage Flash Desalination (MSF) & Reverse Osmosis (RO) – Produces high-quality drinking water from seawater using hybrid treatment.
- Emission Scrubbing & Filtration – Removes particulates, heavy metals, and toxins from exhaust gases to meet environmental standards.
- Automated Control Systems – AI-driven monitoring for energy output, water purity, and operational efficiency.
Investment Details
- Investment Range: $1,000 – $50,000
- Daily ROI: ~0.65%
- Term: 270–360 days
- Annualised ROI: ~237%
- Investor Slots: 20 max
- Returns Type: Fixed daily accrual.
Why Package 2 is Strategic
- Core Production Stage – Where the project actually produces both electricity and water.
- Waste-to-Value Conversion – Turns marine waste into saleable power and potable water.
- Low Emissions – Advanced scrubbing technology ensures compliance with strict environmental standards.
- Dual Revenue Streams – Electricity sales to the grid + potable water supply contracts.
Comments
Review
Up to 85% of the waste is converted into usable syngas for power generation.
The facility can produce between 500,000–1,000,000 litres of clean water per day, depending on intake.
Yes — designed for 24/7 operation with built-in maintenance cycles.
It’s optimised for marine plastics, biomass, and general debris; hazardous materials are diverted for specialised treatment.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Waste & Recycling (Package 2: Gasification & Integrated Desalination Plant – Marine Waste-to-Energy & Water Recovery Project)
- Min A$1,000.00
- Max A$5,000.00
- Target daily ~ 0.65%
- Accrual days ~ 310
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-06-13
- Raised AmountA$48,531.00
- Goal AmountA$500,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%