Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Waste & Recycling (Package 2 – Marine Waste-to-Energy & Water Recovery Project)
RAISED
$48,531.00
GOAL
$500,000.00
Project Overview (Gasification & Integrated Desalination Plant)
Package 2 is the heart of the Marine Waste-to-Energy & Water Recovery Project.
This stage converts the collected marine waste and biomass from Package 1 into renewable electricity and clean potable water through advanced thermal gasification and heat-recovery desalination processes.
By combining these two systems in one facility, the project maximises resource efficiency and minimises emissions.

About Package 2
- High-Temperature Gasification Units – Converts organic waste and plastics into syngas for electricity generation, avoiding open-air incineration.
- Waste Heat Recovery Systems – Captures heat from gasification to power the desalination process.
- Multi-Stage Flash Desalination (MSF) & Reverse Osmosis (RO) – Produces high-quality drinking water from seawater using hybrid treatment.
- Emission Scrubbing & Filtration – Removes particulates, heavy metals, and toxins from exhaust gases to meet environmental standards.
- Automated Control Systems – AI-driven monitoring for energy output, water purity, and operational efficiency.
Investment Details
- Investment Range: $1,000 – $50,000
- Daily ROI: ~0.65%
- Term: 270–360 days
- Annualised ROI: ~237%
- Investor Slots: 20 max
- Returns Type: Fixed daily accrual.
Why Package 2 is Strategic
- Core Production Stage – Where the project actually produces both electricity and water.
- Waste-to-Value Conversion – Turns marine waste into saleable power and potable water.
- Low Emissions – Advanced scrubbing technology ensures compliance with strict environmental standards.
- Dual Revenue Streams – Electricity sales to the grid + potable water supply contracts.
Comments
Review
Up to 85% of the waste is converted into usable syngas for power generation.
The facility can produce between 500,000–1,000,000 litres of clean water per day, depending on intake.
Yes — designed for 24/7 operation with built-in maintenance cycles.
It’s optimised for marine plastics, biomass, and general debris; hazardous materials are diverted for specialised treatment.
Waste & Recycling (Package 2: Gasification & Integrated Desalination Plant – Marine Waste-to-Energy & Water Recovery Project)
- Min $1,000.00
- Max $5,000.00
- Target daily ~ 0.65%
- Accrual days ~ 310
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-06-13
- Raised Amount$48,531.00
- Goal Amount$500,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT