Investment Case Details
Renewable & Green Energy (Package 1 – Outback Solar & Hydrogen Production Facility)
A$69,237.00
A$284,580.00
| ☀️ | Co-invest in the land preparation and solar foundation works — the civil and structural base layer of a large-scale solar + green hydrogen production facility in the Australian Outback. |
|
Daily accrual
~0.35%
per day
|
Annualised target
~128%
over term
|
Term length
200–300
days
|
| ✓ | Case ID: ROW3DFUAGGUM |
| ✓ | Target term: 200–300 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Outback Solar & Hydrogen Production Facility is a landmark renewable energy initiative set in the sun-rich heartlands of Australia. Designed to integrate large-scale solar generation with on-site green hydrogen production, the facility avoids the inefficiencies of transporting electricity over long distances by producing hydrogen directly at the generation site for domestic use and export to a global market projected to reach A$2.5 trillion by 2050.
Package 1 focuses entirely on preparing the physical footprint for both the solar arrays and the supporting infrastructure feeding into the hydrogen production units — a high-capex, low-maintenance phase that funds infrastructure built to serve for over three decades.
| 02 | Scope of Works |
Land preparation and civil foundations are the enabling layer for the entire facility. Without graded land, piling, and utility corridors, no solar array or electrolyser can be installed. This is a high-capex, low-maintenance phase giving investors an entry point with minimal operational risk while funding infrastructure designed to serve for over three decades.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and site survey |
| 2 | Land grading and soil compaction across array and plant zones |
| 3 | Access road and haulage corridor construction |
| 4 | Concrete piling and tracker-mount base installation |
| 5 | Drainage and dust control system fit-out |
| 6 | Perimeter fencing and surveillance installation |
| 7 | Utility corridor and service trench works |
| 8 | Environmental compliance verification and sign-off |
| 04 | Use of Funds |
| Land grading, compaction, and earthworks |
| Access and haulage road construction |
| Concrete piling and tracker-mount foundations |
| Drainage and dust control systems |
| Perimeter fencing and surveillance infrastructure |
| Utility corridors and service trenches |
| Environmental compliance and habitat protection works |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and soil conditions; weather and seasonal delays; equipment procurement; environmental permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🏗
Asset-First Investment
Funding physical, long-lasting infrastructure essential for the facility's operation.
|
⚙
Low Operational Complexity
No mechanical or chemical processes yet — only earthworks and structural build.
|
|
⏳
Multi-Decade Asset Life
Civil infrastructure designed for 30+ years of service with minimal maintenance.
|
🚀
First-Mover Advantage
Early-stage entry into Australia's flagship green hydrogen project.
|
Comments
Review
Package 1 targets approximately 0.35% in daily accruals over a 9-month term (operating window 200–300 days) — translating to roughly 112% total over a typical 320-day cycle, equivalent to an annualised target of around 128%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$450 and extend up to A$15,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 200–300 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Civil foundations and site preparation works form the enabling layer for any utility-scale renewable energy facility — without graded land, foundations, drainage, and utility corridors, no solar array, electrolyser, or storage system can be installed. Infrastructure of this class is engineered for operational lifespans of 30+ years with minimal maintenance, and is typically the lowest-risk phase of a renewable energy build because it involves no mechanical or chemical processes. Within this project, Package 1 establishes the physical base layer that every later stage depends on, while securing early-stage exposure to Australia's National Hydrogen Strategy and the global green hydrogen market projected to reach A$2.5 trillion by 2050. As an asset class, foundational renewable infrastructure sits among the most stable categories of real-asset investment in Australia, with long lifespan and low operational complexity.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Renewable & Green Energy (Package 1: Land Preparation & Solar Foundation Works – Outback Solar & Hydrogen Production Facility)
- Min A$450.00
- Max A$15,000.00
- Target daily ~ 0.35%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Renewable & Green Energy (Package 1: Land Preparation & Solar Foundation Works – Outback Solar & Hydrogen Production Facility)
- Min A$450.00
- Max A$15,000.00
- Target daily ~ 0.35%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$69,237.00
- Goal AmountA$284,580.00
- Created At 2025-05-02