Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Water Security (Package 3 – Northern Inland Water Security Program)
RAISED
$217,432.00
GOAL
$1,000,000.00
Project Overview (Distribution & Monitoring Network)
Package 3 delivers the final stage of the Northern Inland Water Security Program — a robust network of pipelines, pumping stations, and monitoring systems to deliver treated water from the plant to communities and industries across the region.

About Package 3
Scope of Works:
- High-Capacity Pipelines – Steel and ductile iron mains with corrosion-resistant lining.
- Pumping Stations – Strategically located for pressure maintenance and redundancy.
Water Storage Towers
– For localised supply stability and emergency reserves.- Smart Meters & Leak Detection – Network-wide sensors for loss prevention and billing accuracy.
- Remote Monitoring Systems – SCADA-linked for real-time flow, pressure, and quality checks.
- Emergency Shut-Off Systems – For contamination or major leak events.
Investment Details
- Investment Range: $150,000 – $500,000
- Daily ROI: ~0.65%
- Term: 200–300 days
- Annualised ROI: ~237%
- Investor Slots: 15 max
- Returns Type: Fixed daily accrual.
Why Package 3 is Strategic
- Final Step to Market Delivery – Transforms stored and treated water into an accessible resource.
- High Revenue Potential – Distribution fees from multiple sectors.
- Asset Security – Remote monitoring reduces theft, damage, and unaccounted losses.
- Future-Proofing – Network adaptable for desalinated or recycled water in the future.
Comments
Review
Over 300km, covering both remote towns and industrial hubs.
Operated as a public-private partnership with shared governance.
Via continuous pressure monitoring and acoustic leak detection.
Yes, it’s designed for interconnection with existing state and local supply grids.
Water Security (Package 3: Distribution & Monitoring Network – Northern Inland Water Security Program)
- Min $150,000.00
- Max $500,000.00
- Target daily ~ 0.65%
- Accrual days ~ 250
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-06-10
- Raised Amount$217,432.00
- Goal Amount$1,000,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT