Investment Case Details
Renewable & Green Energy (Package 1 – Southern Coast Tidal Energy Project)
A$64,819.00
A$318,743.00
| 🌊 | Co-invest in the turbine base installation stage — the reinforced marine foundations that anchor a pioneering tidal energy project to one of Australia's most promising tidal flow corridors. |
|
Daily accrual
~0.35%
per day
|
Annualised target
~128%
over term
|
Term length
200–300
days
|
| ✓ | Case ID: UH832Z4JJDQJ |
| ✓ | Target term: 200–300 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Southern Coast Tidal Energy Project is a pioneering renewable energy initiative harnessing the predictable power of ocean tides to generate clean electricity. Located in one of Australia's most promising tidal flow corridors, the project combines cutting-edge turbine technology with robust marine engineering to deliver long-term, stable returns.
Unlike wind or solar, tidal energy is constant and predictable — producing electricity twice a day, every day, regardless of weather conditions. Package 1 focuses on the foundational stage: installation of reinforced turbine bases that anchor the energy system to the seabed — a critical phase without which the tidal turbines cannot operate effectively or safely.
| 02 | Scope of Works |
Turbine base installation is the enabling layer for the entire tidal energy facility. Without precision-engineered, seabed-anchored bases, no tidal turbine can operate safely or efficiently. Marine civil infrastructure of this class is engineered for operational lifespans exceeding 30 years, providing an asset-heavy entry point with minimal operational risk during the construction phase.
| 03 | Schedule & Milestones |
| 1 | Mobilisation, marine survey, and geotechnical analysis |
| 2 | Engineering and fabrication of corrosion-resistant base frames onshore |
| 3 | Specialised crane barge and ROV deployment to site |
| 4 | Precision marine installation and seabed anchoring |
| 5 | Diver-assisted final alignment and tolerance verification |
| 6 | Environmental compliance audits and habitat mitigation |
| 7 | Handover to Package 2 turbine assembly stage |
| 04 | Use of Funds |
| Seabed surveying and geotechnical analysis |
| Marine-grade steel base frame fabrication |
| Specialised crane barge and offshore vessel hire |
| ROV and diver-assisted installation services |
| Marine corrosion protection and coatings |
| Environmental compliance and habitat mitigation works |
| Mooring points and cable conduit pre-installation |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; marine weather and tidal window constraints; seabed geotechnical conditions; specialist vessel and equipment availability; environmental permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
⚓
Asset-Backed Foundation
Tangible, high-value marine infrastructure with a lifespan exceeding 30 years.
|
🚀
Early Entry Advantage
Entry before revenue operations begin, positioning for repeat investments in later packages.
|
|
🛡
Risk-Managed Stage
Base installation occurs before high-maintenance equipment is deployed, reducing operational exposure.
|
⏳
Multi-Decade Asset Life
Marine civil foundations designed for 30+ years of submerged service.
|
Comments
Review
Package 1 targets approximately 0.35% in daily accruals over a 9-month term (operating window 200–300 days) — translating to roughly 112% total over a typical 320-day cycle, equivalent to an annualised target of around 128%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$450 and extend up to A$5,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 9-month term (operating window 200–300 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Marine civil foundations form the enabling layer for any tidal energy facility — without precision-engineered, seabed-anchored bases, no tidal turbine can operate safely or generate revenue. Infrastructure of this class is built from marine-grade corrosion-resistant steel, engineered for operational lifespans exceeding 30 years with scheduled inspections, and represents one of the lowest-risk phases of a tidal energy build because it involves no mechanical or electrical processes. Tidal energy itself is among the most predictable renewable resources available — driven by lunar gravitational cycles rather than weather — making it well-suited to long-term offtake contracts with Australian utilities and industrial users. As an asset class, marine foundation infrastructure sits among the most stable categories of real-asset investment in Australia, with long lifespan and minimal operational complexity during the construction phase.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Renewable & Green Energy (Package 1: Turbine Base Installation – Southern Coast Tidal Energy Project)
- Min A$450.00
- Max A$5,000.00
- Target daily ~ 0.35%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Renewable & Green Energy (Package 1: Turbine Base Installation – Southern Coast Tidal Energy Project)
- Min A$450.00
- Max A$5,000.00
- Target daily ~ 0.35%
- Accrual days ~ 320
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$64,819.00
- Goal AmountA$318,743.00
- Created At 2025-04-23