Investment Case Details
Conventional Energy & Power (Package 2 – Northwest Combined Cycle Gas Turbine Power Station)
A$112,153.00
A$500,000.00
Package Summary (Heat Recovery Steam Generator (HRSG) & Balance of Plant)
About Package 2
- Heat Recovery Steam Generators (HRSG) – High-capacity units designed to capture exhaust heat from gas turbines and convert it into high-pressure steam.
- Boiler Feedwater Systems – Pumps, economisers, and preheating systems to maintain optimal steam generation efficiency.
- Cooling Systems – Air-cooled condensers or hybrid cooling systems to optimise steam cycle performance in varying climate conditions.
- Water Treatment Systems – Filtration and chemical treatment units to ensure steam quality and equipment longevity.
- Auxiliary Piping & Valves – All interconnecting systems for steam flow, condensate return, and safety relief.
- On-Site Installation & Commissioning – Mechanical, electrical, and controls integration with the existing turbine systems.
Investment Details
- Investment Range: $20,000 – $200,000
- Daily ROI: ~0.85%
- Term: 300–400 days
- Annualised ROI: ~204%
- Investor Slots: 5 max
- Returns Type: Fixed daily accrual based on investment amount
Why Package 2 is Strategic
- Core Efficiency Boost – Converts waste heat into usable energy, maximising fuel efficiency.
- Higher Output – Significantly increases total plant generation without additional fuel costs.
- Environmental Advantage – Reduces emissions intensity per megawatt produced, supporting ESG compliance.
- Critical Integration – The HRSG and balance-of-plant systems form the link between the gas and steam cycles — without them, combined-cycle benefits cannot be realised.
- Long-Term Value – Properly maintained, these systems operate efficiently for 20+ years, underpinning consistent returns.
Comments
Review
No. Package 2 relies on exhaust heat from the gas turbines installed in Package 1.
The HRSG and steam cycle increase plant efficiency from around 35–40% to up to 60%.
Minimal, with scheduled inspections and cleaning to maintain performance.
Yes. By using waste heat, the plant reduces fuel consumption per unit of electricity generated, lowering CO₂ output.
Immediately upon commissioning, with increased power output and improved efficiency from day one.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Conventional Energy & Power (Package 2: Heat Recovery Steam Generator (HRSG) & Balance of Plant – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.85%
- Accrual days ~ 350
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-06-17
- Raised AmountA$112,153.00
- Goal AmountA$500,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%
