Investment Case Details
Conventional Energy & Power (Package 2 – Northwest Combined Cycle Gas Turbine Power Station)
A$173,872.00
A$542,914.00
| ⚡ | Co-invest in the heat recovery steam generator and balance-of-plant stage — the secondary steam cycle that lifts the 1,200 MW CCGT facility to up to 60% fuel efficiency. |
|
Daily accrual
~0.85%
per day
|
Annualised target
~310%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: VJER2TBMAVZV |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Northwest Combined Cycle Gas Turbine (CCGT) Power Station is a flagship conventional energy project delivering 1,200 MW of reliable, base-load power to Western Australia's industrial sector and regional communities. Combined-cycle technology captures waste heat from natural gas turbines to produce steam for a secondary turbine, raising overall efficiency up to 60% while cutting emissions.
Package 2 delivers the Heat Recovery Steam Generators (HRSG) and essential balance-of-plant infrastructure that transform exhaust heat into additional electricity — the systems that make combined-cycle performance possible.
| 02 | Scope of Works |
HRSG and balance-of-plant systems are the efficiency uplift layer of any combined-cycle facility — they convert waste heat into additional electricity without burning more fuel. This raises overall plant efficiency from around 35–40% to up to 60%, lifting output per unit of gas consumed and reducing emissions intensity per megawatt produced. Properly maintained, HRSG units operate efficiently for 20+ years, underpinning consistent returns across the asset's commercial life.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and HRSG component delivery |
| 2 | Foundation and structural steel erection |
| 3 | Boiler feedwater and economiser installation |
| 4 | HRSG pressure parts assembly and weld QA |
| 5 | Cooling systems and water treatment fit-out |
| 6 | Auxiliary piping, valves, and steam tie-in to existing turbines |
| 7 | Commissioning, performance testing, and efficiency verification |
| 04 | Use of Funds |
| HRSG units procurement and erection |
| Boiler feedwater pumps, economisers, and preheating systems |
| Air-cooled condensers or hybrid cooling systems |
| Filtration and chemical water treatment systems |
| Auxiliary piping, valves, and safety relief systems |
| Mechanical, electrical, and controls integration |
| Performance testing and commissioning |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; HRSG and steam-system integration with existing turbines; cooling-system performance in regional climate; water treatment supply chain; cost escalation; regulatory and operational dependencies.
| ★ | Strategic Rationale |
|
📈
Core Efficiency Boost
Converts waste heat into usable energy, maximising fuel efficiency without extra fuel cost.
|
⚡
Higher Output
Significantly increases total plant generation without additional fuel consumption.
|
|
🌿
Environmental Advantage
Reduces emissions intensity per megawatt produced, supporting ESG compliance.
|
🔗
Critical Integration
Without HRSG and balance-of-plant systems, combined-cycle benefits cannot be realised.
|
Comments
Review
Package 2 targets approximately 0.85% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 297% total over a typical 350-day cycle, equivalent to an annualised target of around 310%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 2 start at A$20,000 and extend up to A$200,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Heat Recovery Steam Generators and balance-of-plant systems are what turn a single-cycle gas plant into a true combined-cycle facility. Single-cycle gas turbines typically operate at around 35–40% thermal efficiency; adding HRSG-driven steam cycles lifts that figure to up to 60% — a substantial improvement in fuel productivity that flows directly through to operating margins and emissions intensity per megawatt-hour. Equipment of this class is engineered for operational lifespans of 20+ years with scheduled inspections and cleaning, and is standard equipment on every modern gas-fired base-load plant globally. Within this project, Package 2 is the stage that captures the efficiency premium underpinning the facility's long-term contract economics. As an asset class, efficiency-enhancement infrastructure for thermal generation sits among the most stable categories of real-asset investment in Australia.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 2, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 2 remains available only while allocation capacity is open.
Conventional Energy & Power (Package 2: Heat Recovery Steam Generator (HRSG) & Balance of Plant – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.85%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Conventional Energy & Power (Package 2: Heat Recovery Steam Generator (HRSG) & Balance of Plant – Northwest Combined Cycle Gas Turbine Power Station)
- Min A$20,000.00
- Max A$200,000.00
- Target daily ~ 0.85%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$173,872.00
- Goal AmountA$542,914.00
- Created At 2025-06-17