Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Waste & Recycling (Package 3 – Marine Waste-to-Energy & Water Recovery Project)
RAISED
$48,972.00
GOAL
$1,000,000.00
Project Overview (Electricity & Water Distribution Infrastructure)
Package 3 delivers the outputs of the Marine Waste-to-Energy & Water Recovery Project — renewable electricity and potable water — to the end users.
This stage ensures maximum market reach, operational reliability, and long-term revenue security by creating robust, redundant distribution networks across coastal and island regions.

About Package 3
- Electrical Transmission Lines & Substations – High-voltage lines and local substations connect the plant to the national grid and regional microgrids.
- Water Storage & Pumping Stations – Large-scale storage reservoirs and automated pumping facilities ensure steady water supply.
- Marine & Island Distribution Pipelines – Subsea and coastal pipelines deliver fresh water to remote areas.
- Smart Metering Systems – Digital monitoring for real-time usage tracking and billing.
- Grid & Supply Redundancy Systems – Backup circuits and dual-pipeline routes to guarantee continuous service.
Investment Details
- Investment Range: $800 – $25,000
- Daily ROI: ~0.48%
- Term: 240–320 days
- Annualised ROI: ~175%
- Investor Slots: 25 max
- Returns Type: Fixed daily accrual.

Why Package 3 is Strategic
- Revenue Realisation Stage – Converts generated power and water into billable outputs.
- Market Expansion – Infrastructure designed for regional growth and cross-border export potential.
- Operational Reliability – Redundant systems reduce downtime risks and penalties.
- Community Impact – Brings power and clean water to underserved areas, enhancing public relations and project visibility.
Comments
Review
Yes, all grid interconnections and substations are included.
Yes, with separate treatment and distribution channels for each type of customer.
Absolutely — corrosion-resistant materials are used for long service life.
Fully automated smart metering and digital payment systems ensure fast, transparent transactions.
Waste & Recycling (Package 3: Electricity & Water Distribution Infrastructure – Marine Waste-to-Energy & Water Recovery Project)
- Min $800.00
- Max $25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 275
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-04-26
- Raised Amount$48,972.00
- Goal Amount$1,000,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT