Investment Case Details


*Concept render
*Imagery is illustrative unless marked As‑built. Specs, layout and schedule may change.
Infrastructure & Transport (Package 1 – National Freight Link Upgrade)
RAISED
$70,965.00
GOAL
$250,000.00
Project Overview (Rail Corridor Expansion & Foundation Works)
The National Freight Link Upgrade is a large-scale infrastructure initiative aimed at boosting Australia’s freight capacity and efficiency by modernising key rail corridors connecting major ports, industrial hubs, and inland logistics centres.
While future packages will address track electrification, signalling, and advanced freight handling, Package 1 focuses on the groundwork — expanding and stabilising the corridor to handle high-capacity freight trains for decades.
This package is about laying the physical and geotechnical foundation to ensure the rest of the project is built on rock-solid infrastructure.

About Package 1
Package 1 covers all site preparation and early-stage construction activities, including:
- Land Clearing & Grading – Removal of obstructions, vegetation, and unstable soil along the corridor.
- Earthworks & Embankments – Raising, compacting, and reinforcing the rail bed to withstand heavy axle loads.
- Bridge & Culvert Installation – New water-crossing structures for improved drainage and resilience in flood-prone zones.
- Ballast Laying Preparation – Graded foundation for future rail track installation.
- Geotechnical Stabilisation – Soil reinforcement, retaining walls, and slope protection.
Investment Details
- Investment Range: $800 – $25,000
- Daily ROI: ~0.48%
- Term: 260–330 days
- Annualised ROI: ~175%
- Investor Slots: 30 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 1 is Strategic
- Core Physical Infrastructure – All future rail works depend on a stable and reinforced corridor.
- Climate Resilience – Built to withstand extreme weather and flood events.
- Longevity – Structural components have a 40–50 year lifespan.
- Critical to Freight Efficiency – A stable, widened corridor supports faster freight times and heavier loads.
Comments
Review
Yes — each package is independent, though this stage is the backbone for all others.
Delays from weather events; mitigated with rapid drainage systems and staged construction.
No — track installation is part of Package 2.
Around 8–10 months, depending on weather and site conditions.
Early-stage investors often secure better entry terms and are first in line for future package allocations.
Infrastructure & Transport (Package 1: Rail Corridor Expansion & Foundation Works – National Freight Link Upgrade)
- Min $800.00
- Max $25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Payouts At Term
- Capital Back YES
- Start Allocation
*Targets only; not guarantees. Full terms in the Offer Docs.
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-18
- Raised Amount$70,965.00
- Goal Amount$250,000.00
Recent Cases

Water Security (Package 2 – Murray-Darling Basin Advanced Irrigation & Water Storage Project)
By
REO Admin
RAISED TO DATE
$48,236.00
PROFIT
0.50%

Mining & Resources(Package 1 – Pilbara Rare Earths Extraction & Processing Facility)
By
REO Admin
RAISED TO DATE
$54,512.00
PROFIT
0.60%

Conventional Energy & Power (Package 1 – Northwest Combined Cycle Gas Turbine Power Station)
By
REO Admin
RAISED TO DATE
$53,182.00
PROFIT
0.65%

Renewable & Green Energy (Package 3 – Southern Coast Tidal Energy Project)
By
REO Admin
RAISED TO DATE
$83,148.00
PROFIT
0.95%

Waste & Recycling (Package 1 – Marine Waste-to-Energy & Water Recovery Project)
By
REO Admin
RAISED TO DATE
$48,021.00
PROFIT