Investment Case Details
Infrastructure & Transport (Package 1 – National Freight Link Upgrade)
A$70,965.00
A$250,000.00
Package Summary (Rail Corridor Expansion & Foundation Works)

About Package 1
- Land Clearing & Grading – Removal of obstructions, vegetation, and unstable soil along the corridor.
- Earthworks & Embankments – Raising, compacting, and reinforcing the rail bed to withstand heavy axle loads.
- Bridge & Culvert Installation – New water-crossing structures for improved drainage and resilience in flood-prone zones.
- Ballast Laying Preparation – Graded foundation for future rail track installation.
- Geotechnical Stabilisation – Soil reinforcement, retaining walls, and slope protection.
Investment Details
- Investment Range: $800 – $25,000
- Daily ROI: ~0.48%
- Term: 260–330 days
- Annualised ROI: ~175%
- Investor Slots: 30 max
- Returns Type: Fixed daily accrual based on investment amount.
Why Package 1 is Strategic
- Core Physical Infrastructure – All future rail works depend on a stable and reinforced corridor.
- Climate Resilience – Built to withstand extreme weather and flood events.
- Longevity – Structural components have a 40–50 year lifespan.
- Critical to Freight Efficiency – A stable, widened corridor supports faster freight times and heavier loads.
Comments
Review
Yes — each package is independent, though this stage is the backbone for all others.
Delays from weather events; mitigated with rapid drainage systems and staged construction.
No — track installation is part of Package 2.
Around 8–10 months, depending on weather and site conditions.
Early-stage investors often secure better entry terms and are first in line for future package allocations.
No. Returns are targets; capital is at risk.
After allocation on cleared funds; visible in your dashboard.
Per the schedule on the case page; history shows in your dashboard.
Eligible investors in Australia and overseas (Retail vs Wholesale/Professional determined during KYC).
Retail: PDS + TMD. Wholesale/Professional: IM. Offer docs by email; case pages show current terms.
Bank transfer to the trust/suspense account (+5% processing) or crypto (0%) where offered.
Retail only (per law). Not typical for wholesale/professional.
Yes, subject to availability and current terms. Request re-allocation or withdraw in your dashboard.
Milestones/updates in your dashboard; optional 15–20 minute phone briefing on request.
Active worksites are closed to visitors. We provide documents/updates; phone briefings available.
Admin fee: 3% of capital per term, deducted from returned capital at maturity. Bank transfer: +5% processing (added on deposits; deducted on withdrawals). Crypto: 0% (network fees may apply).
Infrastructure & Transport (Package 1: Rail Corridor Expansion & Foundation Works – National Freight Link Upgrade)
- Min A$800.00
- Max A$25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Payouts On Request — Manager Approval
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Cases Info
- Created By REO Admin
- Created At 2025-05-18
- Raised AmountA$70,965.00
- Goal AmountA$250,000.00
Recent Cases
A$48,847.00
0.50%
A$54,512.00
0.60%
A$53,182.00
0.65%
A$83,148.00
0.95%