Investment Case Details
Infrastructure & Transport (Package 1 – National Freight Link Upgrade)
A$89,741.00
A$272,714.00
| 🚆 | Co-invest in the rail corridor expansion and foundation works — the geotechnical groundwork for a national freight rail upgrade connecting Australia's major ports, industrial hubs, and inland logistics centres. |
|
Daily accrual
~0.48%
per day
|
Annualised target
~175%
over term
|
Term length
260–330
days
|
| ✓ | Case ID: X6Z4J77R4VRY |
| ✓ | Target term: 260–330 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The National Freight Link Upgrade is a large-scale infrastructure initiative aimed at boosting Australia's freight capacity and efficiency by modernising key rail corridors connecting major ports, industrial hubs, and inland logistics centres. While future packages will address track electrification, signalling, and advanced freight handling, Package 1 focuses on the groundwork — expanding and stabilising the corridor to handle high-capacity freight trains for decades.
This package is about laying the physical and geotechnical foundation to ensure the rest of the project is built on rock-solid infrastructure.
| 02 | Scope of Works |
Rail corridor expansion and foundation works are the enabling layer for the entire freight link — all future rail works depend on a stable and reinforced corridor. Structural components at this stage are engineered for 40–50 year lifespans, built to withstand extreme weather and flood events while supporting faster freight times and heavier axle loads across Australia's national freight network.
| 03 | Schedule & Milestones |
| 1 | Mobilisation, land clearing, and grading |
| 2 | Earthworks, embankments, and rail bed compaction |
| 3 | Bridge and culvert installation in flood-prone zones |
| 4 | Geotechnical stabilisation and retaining walls |
| 5 | Slope protection and erosion controls |
| 6 | Ballast laying preparation and graded foundation |
| 7 | Quality assurance and handover to track construction |
| 04 | Use of Funds |
| Land clearing, vegetation removal, and grading |
| Earthworks, embankments, and rail bed reinforcement |
| Bridge and culvert structures |
| Geotechnical stabilisation materials and retaining walls |
| Slope protection and drainage systems |
| Ballast preparation and graded foundation works |
| Heavy equipment hire and quality assurance |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; geotechnical and soil conditions; weather and flood events; equipment procurement; environmental permitting; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🏗
Core Physical Infrastructure
All future rail works depend on a stable and reinforced corridor.
|
🌧
Climate Resilience
Built to withstand extreme weather and flood events.
|
|
⏳
Longevity
Structural components have a 40–50 year lifespan.
|
📦
Critical to Freight Efficiency
A stable, widened corridor supports faster freight times and heavier loads.
|
Comments
Review
Package 1 targets approximately 0.48% in daily accruals over a 10-month term (operating window 260–330 days) — translating to roughly 144% total over a typical 300-day cycle, equivalent to an annualised target of around 175%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$800 and extend up to A$25,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 10-month term (operating window 260–330 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Yes. REO accepts participants from Australia and overseas. Registration is straightforward — create your account, complete the standard KYC check, then you can review the available package and choose your allocation through the dashboard.
Yes. REO support is available if you would like to speak with someone directly before moving forward. A team member can walk you through the opportunity, answer questions, and help make the process clearer. For larger allocations, an account manager may also be assigned to assist with setup and ongoing account support.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Rail corridor earthworks and geotechnical foundations form the enabling layer for every major freight rail project in Australia. Without graded embankments, stabilised rail beds, bridges, culverts, and slope protection, no track, signalling, or terminal infrastructure can be installed. Civil works of this class are engineered for 40–50 year lifespans, designed to carry heavy axle loads and withstand extreme weather, and represent one of the lowest-risk phases of a major rail build because they involve no mechanical, electrical, or revenue-generating systems. Within the National Freight Link Upgrade, Package 1 establishes the physical base layer that every subsequent stage depends on, while securing early-stage exposure to a strategically positioned corridor connecting Australia's ports, industrial hubs, and inland logistics centres. As an asset class, rail foundation infrastructure sits among the most stable categories of real-asset investment in Australia, with long lifespan and low operational complexity.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Infrastructure & Transport (Package 1: Rail Corridor Expansion & Foundation Works – National Freight Link Upgrade)
- Min A$800.00
- Max A$25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Infrastructure & Transport (Package 1: Rail Corridor Expansion & Foundation Works – National Freight Link Upgrade)
- Min A$800.00
- Max A$25,000.00
- Target daily ~ 0.48%
- Accrual days ~ 300
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$89,741.00
- Goal AmountA$272,714.00
- Created At 2025-05-18