Investment Case Details
Conventional Energy & Power (Package 1 – Southern Coast Carbon Capture & Clean Coal Power Facility)
A$103,395.00
A$264,158.00
| 🏭 | Co-invest in the carbon-capture-ready Boiler Island — the heart of the steam cycle for a 1,000 MW clean coal power facility designed for low-emission base-load generation. |
|
Daily accrual
~0.65%
per day
|
Annualised target
~237%
over term
|
Term length
300–400
days
|
| ✓ | Case ID: Z9EYSH93JV9A |
| ✓ | Target term: 300–400 days (buffer up to +60 days with notice) |
| ✓ | Withdrawals: On request. Same-day for smaller amounts; larger sums released in tranches over several days. |
| ✓ | Capital Back: Yes — at project finish |
| ✓ | Dashboard tracking: Daily accruals, transaction history, withdrawal records, and case updates are visible through the investor account. |
| ✓ | Updates: 15–20 minute phone briefing with a dedicated team member on request. |
| ⓘ | All figures are targets, not guarantees. Capital is at risk. Full terms in the offer documents. |
| 01 | Package Summary |
The Southern Coast Carbon Capture & Clean Coal Power Facility is a next-generation conventional energy project designed to deliver 1,000 MW of stable base-load power while drastically reducing CO₂ emissions. Located on a deep-water port, the facility is purpose-built to supply power-hungry industries and urban grids while meeting Australia's future emissions regulations.
Unlike traditional thermal plants, this project integrates a carbon capture and storage (CCS) system from day one, allowing for the capture of up to 90% of CO₂ emissions for underground sequestration or industrial reuse.
Package 1 delivers the carbon-capture-ready Boiler Island — the heart of the steam cycle and the foundation for low-emission energy generation.
| 02 | Scope of Works |
Package 1 lays the foundational steam generation infrastructure for the entire facility. Without the Boiler Island in place, no later stage — neither carbon capture nor grid export — can produce a single megawatt of power. Ultra-supercritical boilers operate at higher temperatures and pressures than conventional units, raising thermal efficiency and reducing fuel use per MWh, with operational lifespans of 25–30 years under proper maintenance.
| 03 | Schedule & Milestones |
| 1 | Mobilisation and heavy-lift logistics planning |
| 2 | Boiler steel structure erection |
| 3 | Pressure parts and feedwater system installation |
| 4 | Burners, ducting, and emissions treatment fit-out |
| 5 | Control and safety systems integration |
| 6 | Hydrostatic testing and CCS-readiness checks |
| 7 | Commissioning and load testing |
| 04 | Use of Funds |
| Ultra-supercritical boiler procurement and erection |
| Low-NOx burners and flue gas treatment systems |
| Fuel handling — conveyors, silos, and feed systems |
| High-pressure steam piping and feedwater circuits |
| Boiler control, safety, and CCS-integration systems |
| Heavy-lift logistics, transport, and cranes |
| Hydrostatic testing, commissioning, and load testing |
| 05 | How the Process Works |
From start to allocation in 5 clear steps
| 1 | Start AllocationClick "Start Allocation" on this page to begin |
| 2 | Complete KYCShort identity verification in your account |
| 3 | Receive DocumentsPDS + TMD (retail) or IM (wholesale) by email |
| 4 | Fund Your AccountBank transfer to a secure allocation account, or approved crypto |
| 5 | Allocate & TrackAllocation confirmed on cleared funds; track accruals through your dashboard |
| ⓘ | Returns are targets, not guarantees; capital is at risk. Application monies are received into a secure allocation account designated for the offer. |
| 06 | Fees |
| 3% | Management fee — of principal per term, deducted from principal at maturity. Profits untouched. |
| ⚠ | Key Risks |
Construction and schedule; high-pressure boiler integrity; fuel supply and quality; emissions regulation and compliance; cost escalation; counterparty and operational dependencies.
| ★ | Strategic Rationale |
|
🏭
Foundation for CCS Integration
Boilers are designed to work seamlessly with carbon capture technology in later stages.
|
📋
Regulatory Advantage
Meets upcoming emissions requirements, supporting long-term operational approval.
|
|
💎
Market Premium
Clean coal power commands higher rates from ESG-conscious buyers.
|
🔥
Fuel Flexibility
Capable of operating on coal, biomass, or mixed fuel to manage price volatility.
|
Comments
Review
Package 1 targets approximately 0.65% in daily accruals over a 12-month term (operating window 300–400 days) — translating to roughly 227% total over a typical 350-day cycle, equivalent to an annualised target of around 237%. Returns are tracked transparently from the day your allocation is confirmed, with full conditions detailed in the offer documents.
Allocations to Package 1 start at A$400 and extend up to A$20,000 per investor. Wholesale and Professional investors may discuss larger allocations directly with our team, subject to availability and applicable documentation.
Your principal is returned in full at the completion of the project, typically within the 12-month term (operating window 300–400 days). A buffer of up to +60 days is allowed for construction variability, with any changes communicated in advance through your dashboard.
Yes. While the principal remains allocated to the project until completion, accrued profits can be withdrawn at any time through your dashboard. Smaller amounts are processed same-day; larger sums are released in tranches over several days.
A single 3% administration fee on capital is deducted from the returned principal at maturity. Accrued profits are paid in full — there are no performance fees, exit fees, or hidden charges.
Accruals begin on the day your funds clear and your allocation is confirmed. Each daily accrual is visible in your dashboard from that point forward.
REOCORP PTY LTD is an Australian private company focused on infrastructure, energy, resources, and essential project operations. REO provides case-specific participation opportunities connected to selected real-asset projects, with allocations administered directly through its investor platform and supporting offer documents. Company details are publicly verifiable through Australian business registers under ABN 13 620 130 958.
Eligible investors based in Australia and overseas are welcome. A standard KYC process classifies investors as Retail or Wholesale / Professional, ensuring the correct offer documentation applies — PDS and TMD for Retail investors, IM for Wholesale and Professional investors. Onboarding is fully digital and typically completed within 24 hours.
Yes. Support is available throughout the process — a 15–20 minute phone briefing with a team member can be arranged on request. Larger allocations are supported by a named account manager who remains available for the duration of the term.
Once KYC is complete, allocations are funded via secure bank transfer to a designated allocation account, or through approved crypto channels. Account details and instructions are included in the offer documents.
Your dashboard provides a complete view of your position — current balance, accrual history, transaction log, withdrawal records, and personal profile — accessible at any time.
Most investors complete agreement, document review, and KYC verification within 24 hours. Allocation typically settles on the same business day once funds are received.
Ultra-supercritical boilers form the steam-generation core of modern base-load power facilities — operating at higher temperatures and pressures than conventional units to deliver greater thermal efficiency and lower fuel consumption per megawatt-hour. Equipment of this class is engineered for operational lifespans of 25–30 years with regular maintenance cycles, and is increasingly built CCS-ready to meet tightening emissions limits under frameworks such as Australia's Safeguard Mechanism. Within this project, the Boiler Island is the foundation that makes every later revenue stream possible — power dispatch on the National Electricity Market, CCS-enabled premium pricing, and export. As an asset class, high-efficiency thermal generation infrastructure sits among the most established categories of real-asset investment in Australia, supported by long-term base-load demand from industrial users.
Click "Start Allocation" on this page, complete the short KYC verification, and fund your account. Once your funds clear, choose Package 1, allocate your preferred amount, and your dashboard will show your active position, daily accruals, and transaction history. Package 1 remains available only while allocation capacity is open.
Conventional Energy & Power (Package 1: Carbon-Capture-Ready Boiler Island Installation – Southern Coast Carbon Capture & Clean Coal Power Facility)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Agreement Paper
Conventional Energy & Power (Package 1: Carbon-Capture-Ready Boiler Island Installation – Southern Coast Carbon Capture & Clean Coal Power Facility)
- Min A$400.00
- Max A$20,000.00
- Target daily ~ 0.65%
- Accrual days ~ 350
- Withdrawals On request. Same-day for smaller amounts; larger sums released in tranches over several days
- Capital Back Yes — At Project Finish
- Start Allocation
Cases Info
- Raised AmountA$103,395.00
- Goal AmountA$264,158.00
- Created At 2025-06-17